Golf Course Driving Range at Ramstein Air Base, Germany

Open Pre-Solicitation Posted

Solicitation number
RAMSF60761
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
513210 Software Publishers
PSC
H370 Inspection- Adp Equipment/Software/Supplies/Support Equipment
Place of performance
Ramstein Germany
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force, United States Air Forces in Europe - Air Forces Africa, will solicit a golf ball tracking technology installation for the Golf Course Driving Range at Ramstein Air Base, Germany, with responses due November 17, 2026. The requirement will be solicited among local European sources that can meet the customer's needs, and no set-aside is used. The work covers all 18 bays of the Woodlawn Driving Range. The contractor will install the minimum required cameras and radars to capture data across the full driving range at full capacity, plus a monitor at each bay in a location that is easily viewable by customers, out of the way, and protected from weather. The contractor will install wire tracks as needed to reduce exposed wiring and will return the facility to its prior condition. The contractor will be able to provide a virtual rendering of Woodlawn Golf Course for virtual play. The government will provide power and internet drops in each of the 18 bays, trenching for power and data cables, and site access Monday through Friday, 0600 to 1800 hours, with weekend hours to be discussed as needed. The notice names no incumbent, period of performance, award value, or industry engagement event. Classification codes are NAICS 513210 (Software Publishers) and PSC H370.

Notice text

This requirement will be solicited among local European sources that can meet the customer's needs listed below.

Statement of Needs for Golf Course Driving Range/Woodlawn Driving Range:

1.0 Requirement: Install golf ball tracking technology at the driving range all (18 bays) to provide customers with real time data for practicing/playing purposes.

  1. Contractor will install the minimum required cameras/radars to capture data for the entire driving range operating at full capacity.
  2. Contractor will install monitors at each bay (18) in an area that is easily viewable by customers but out of the way and protected by the weather.
  3. Contactor will install wire tracks as needed, reducing the number of exposed wires.
  4. Contractor will return the facility to the same condition as it was before installation began.
  5. Contractor will be able to provide a virtual rendering of Woodlawn Golf Course for virtual playing.

1.1 Golf course provides the following:

  1. Install power and internet drops in each bay (18). Trenching for power/data cables.
  2. Access to the work location during the hours of operation:  Monday – Friday, 0600 – 1800 hours. Weekend hours to be discussed as needed.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors