Glen Canyon Powerplant and Lake Powell Switchyard
Closed Pre-Solicitation Posted
- Solicitation number
- 140R4026R0015
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Bureau of Reclamation is conducting market research through this Sources Sought notice to support future procurement planning for electrical installation and power plant construction at Glen Canyon Powerplant and Lake Powell Switchyard in Coconino County, Arizona. The primary work involves the removal and replacement of station service transformers along with associated electrical, protection, and structural modifications at the facility located approximately two miles northwest of Page, Arizona. This is a market research announcement issued under FAR Part 10 and does not constitute a formal solicitation, request for proposal, or bid opportunity; no contract will be awarded from this notice, and no reimbursement will be provided for response costs. The information gathered will inform a future competitive acquisition under FAR Parts 15 and 36. Interested firms are advised that the due date for submitting market research responses is May 1, 2026.
The procurement carries no set-aside designation and does not identify any current contractor or incumbent. The work specifically requires the furnishing, installation, and commissioning of three outdoor, three-phase station service transformers with the following specifications: two transformers rated at 3.75/4.687 MVA with 13.8 kV high-side voltage and 4.16 kV low-side voltage, and one transformer rated at the same MVA with 25 kV high-side voltage and matching 4.16 kV low-side voltage; all units feature natural ester insulating fluid, 6.5 percent impedance, and tap changer capabilities. Additional work includes installation of new neutral grounding resistors and removal or replacement of nonsegregated bus components. The notice does not disclose a specific contract value or award range, as this is preliminary market research intended to inform scope definition and acquisition strategy for the eventual solicitation.
Notice text
Department of the Interior
Bureau of Reclamation – Upper Colorado Region
Glen Canyon Powerplant and Lake Powell Switchyard
NOTICE TYPE: Sources Sought (Market Research)
NAICS: 237130 – Power and Communication Line and Related Structures Construction
PSC: Y1MD Construction of Electrical Installations and Power Plants
1. NOTICE DESCRIPTION
This Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10.
This is NOT a solicitation, request for proposal, bid, or quote.
No contract will be awarded from this notice. No reimbursement will be provided for costs associated with responding.
Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36.
2. PROJECT LOCATION
Glen Canyon Powerplant and Lake Powell Switchyard
Glen Canyon Dam
Coconino County, Arizona (approx. 2 miles northwest of Page, AZ)
3. PROJECT OVERVIEW
The Bureau of Reclamation anticipates a construction requirement to furnish and install three (3) outdoor, three-phase station service transformers and perform associated electrical, protection, and structural work.
4. PRINCIPAL COMPONENTS OF WORK
A. Transformer Removal and Replacement
Removal and disposal of two (2) existing station service transformers.
Furnishing, installing, and commissioning three (3) new transformers:
Two (2) transformers:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 13.8 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
One (1) transformer:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 25 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester
B. Additional Electrical & Structural Modifications
• Install new neutral grounding resistors.
• Remove/replace nonsegregated bus on lowside of two transformers.
• Modify highside isolatedphase bus.
• Furnish and install one (1) interrupter switch.
• Remove two (2) existing transformer protection relays; install three (3) new relays.
• Install six (6) current transformers.
• Remove existing concrete containment; install three (3) new containment systems.
• Remove/install 5 kV cable through powerplant.
• Remove/install approx. 2,000 LF of 25 kV armored cable via tunnel and underground conduit.
• Install three (3) singlepole fused disconnect switches.
• Remove and replace three (3) surge arresters.
5. ESTIMATED MAGNITUDE OF CONSTRUCTION
Between $10,000,000 and $25,000,000
6. ANTICIPATED PERIOD OF PERFORMANCE
• Period of Performance: TBD
• Anticipated Contract Award: 2nd Quarter FY 2027
7. SUBMISSION REQUIREMENTS
Interested and capable firms are requested to submit the following:
Company Information
• Name, physical address, UEI, points of contact, phone, and email.
Business Size & SBA Program Status under NAICS 237130 and 335311
• Indicate Small Business, HUBZone, 8(a), SDVOSB, WOSB, SDB, or Large Business.
• SBA certification must be verifiable in SAM.gov.
Capabilities Statement
• Demonstrate relevant experience and capability to perform all required work.
Transformer Manufacturer Information
• Manufacturer name and country of origin.
• Documentation supporting compliance with FAR 52.2255 (Trade Agreements) and/or 52.22511 (Buy American – Construction Materials).
Estimated Transformer Lead Time
• Assume NTP = January 25, 2027 for market research purposes.
Market Conditions & Economic Price Adjustment Input
• Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable.
Transformer Pricing Indices Used
• Identify indices commonly applied for transformers with these characteristics.
Bonding Capacity
• Provide aggregate and single project bonding limits.
8. RESPONSE DELIVERY
Email responses only to:
Lisa Laughbon
Contracting Officer
Email: lisa_laughbon@ios.doi.gov
Response Deadline: COB 5/1/2026