General Construction BOA Contractors only: DTFAEN-12-R-00046-Rehabilitation of the San Juan Air Traffic Control Tower (ATCT), San Juan, PR

Closed Solicitation Posted

Solicitation number
DTFAEN-12-R-00046
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Proposals are being requested and this solicitation DTFAEN-12-R-00046 is being issued as a Request for Offer (RFO).

FAA has a requirement for the Rehabilitation of the San Juan Air Traffic Control Tower (ATCT), San Juan, PR

The NAICS code is 237990-Other Heavy and Civil Engineering Construction and Size Standard $33.5

This requirement is SOLELY SET-ASIDE for the Pre-Existing/Qualified Contractors under the Eastern Logistics Service Area Basic Ordering Agreements (BOA) for General Construction (Major and Moderate Multidiscipline Construction and Modernization, Civil Engineering capabilities)

SITE VISIT: There is a ONE-TIME ONLY site visit scheduled on April 17, 2012 at 9:30 AM at the San Juan Air Traffic Control Tower, San Juan, Puerto Rico. Contact Rolando Colon-Perez at 404-702-9562. to schedule to attend. Attendance is HIGHLY RECOMMENDED. All questions shall be addressed to the Contracting Officer in writing via email or fax.

All proposals must be received no later than April 27, 2012, 2:00 PM EST.

Any responses received after April 27, 2012, 2:00 PM EST, will not be considered in accordance with AMS provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals.

This SIR is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.

Update #1 ·

***Note to Potential offerors***Amendment 0002 to update/correct drawingsDetail A/A601 on sheet SJU-D-ATCT-A601 shall be replaced with drawing titled SJU-Gutter Detail. The window type on Detail 2/A602 on sheet ATCT-1-A602 should be change per the attached redlines in drawing titled Correction SJU D ATCT 1 A602. Drawing SJU-2hor Shaft wall detail is added.

***Note to Potential offerors***Question and Answers have been posted on May 7th 2012. All additional questions must be submitted no later than 4:00 PM EST on May 7th 2012, to allow for adequate time to responds.

***Note to Potential offerors***The close date has been extended to May 11, 2012 at 3:00 PM EST.



Proposals are being requested and this solicitation DTFAEN-12-R-00046 is being issued as a Request for Offer (RFO).

FAA has a requirement for the Rehabilitation of the San Juan Air Traffic Control Tower (ATCT), San Juan, PR

The NAICS code is 237990-Other Heavy and Civil Engineering Construction and Size Standard $33.5

This requirement is SOLELY SET-ASIDE for the Pre-Existing/Qualified Contractors under the Eastern Logistics Service Area Basic Ordering Agreements (BOA) for General Construction (Major and Moderate Multidiscipline Construction and Modernization, Civil Engineering capabilities)

SITE VISIT: There is a ONE-TIME ONLY site visit scheduled on April 17, 2012 at 9:30 AM at the San Juan Air Traffic Control Tower, San Juan, Puerto Rico. Contact Rolando Colon-Perez at 404-702-9562. to schedule to attend. Attendance is HIGHLY RECOMMENDED. All questions shall be addressed to the Contracting Officer in writing via email or fax.

All proposals must be received no later than April 27, 2012, 2:00 PM EST.

Any responses received after April 27, 2012, 2:00 PM EST, will not be considered in accordance with AMS provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals.

This SIR is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.

Files

File Type Posted
Bid_Bond_Form.doc DOC document
SF304.pdf PDF
SJU_SCH_of_BID_ITEMS.pdf PDF
Construction_BOA_RFP.pdf PDF
595D86EB-5056-A051-792D38ABE551CF66.txt TXT text file
SJU_Construction_Specifications.pdf PDF
SJU_Construction_Drawings.pdf PDF
Correction_SJU_D_ATCT_1_A602.pdf PDF
SJU_-_2_hr_Shaft_wall_detail.pdf PDF
SJU_-_GUTTER_DETAIL.pdf PDF
AMENDMENT_0002_SAN_JUAN_TOWER.pdf PDF
Q_and_A.xls XLS spreadsheet
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors