Gas Line Repair
Closed Solicitation Posted
- Solicitation number
- 21-19-299PMW068
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 561790 Other Services to Buildings and Dwellings
- PSC
- Not on record
- Place of performance
- 453 Admiral Craik Drive Grand Isle, Louisiana 70358, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Scope of Work was incorrect. Come to find out after speaking to the rep in Grand Isle the Scope of Work was misleading due to some of the items listed wasn't needed and some work that was left off. We are working with the local rep to get an accurate Scope of Work and will repost this soliciation.
.
Update #1 ·
STATEMENT OF WORK
FOR
USCG Base New Orleans Housing
Station Grand Isle LA, 70358
CERTIFICATION OF REPLACEMENT OF NATURAL GAS LINES AT TWO GOVERNMENT OWNED HOUSING UNITS IN GRAND ISLE LA, 70358 FOR USCG BASE NEW ORLEANS HOUSING
PART 1 GENERAL
1.01 INTENT: Removal, disposal, install, and test of new natural gas lines at unit 03 and 11 Paratus Pl. Grand Isle LA, 70358.
1.02 SCOPE: This contract covers a service agreement that meets or exceeds the requirements covered herein and detailed in section 1.05 below.
1. Contact natural gas Company to secure meter "if needed".
2. Remove old natural gas line, dispose, and replace with new.
3. Replace valves and fittings as needed, on boiler/hot water tank too "if needed".
4. Back fill trench.
5. Contact city inspector for test/inspection.
6. Contact Gas Company to re-establish service "if needed".
7. Light piolet flame.
8. Inspection by OHMC or Local housing rep.
1.03 GOVERNMENT FURNISHED: N/A.
1.04 CONTRACTOR FURNISHED: All labor, materials, and supervision in order to accomplish the below requirements
1.05 REQUIREMENTS: The Contractor shall meet the desired outcome listed below and perform to the standards indicated.
A. Contractor is to purchase all needed supplies and materials.
B. Remove and disposal of all damaged materials.
C. Install new gas line and all needed parts.
D. Contact city inspector for test and certification.
E. After inspection, contractor /vendor shall receive payment.
PART 2 INSPECTIONS AND ACCEPTANCE
2.01 Contracting Officer: The Contracting Officer has the overall responsibility for the administration of this contract. He or she alone is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, details or delivery schedules. The Contracting Officer may delegate certain technical responsibilities to a technical representative.
2.02 Inspection: Contractor will be accompanied by a member of Base New Orleans Housing Office or Local unit rep for duration of service visit. Contractor will provide all required documentation for service visit at the conclusion of servicing.
.
Files
| File | Type | Posted |
|---|---|---|
| Commercial_Supplies_&_Services_Clauses__&_Provisions_FAC_2019-01.doc | DOC document | |
| Solicitation_Package.docx | DOCX document | |
| SF18.pdf | ||
| Wage_Rates.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Gas Line Repair | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity