FY26 HSC Bayport Flare Dredging
Closed Pre-Solicitation Posted
Not the latest version. See the latest pre-solicitation from .
- Solicitation number
- W912HY26X5507
- Agency
-
ENDIST Galveston
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KB Maintenance Of Canals
- Place of performance
- Houston, Texas, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Galveston District is conducting a Sources Sought synopsis (W912HY26X5507) to identify qualified contractors for hopper dredging services on the Houston Ship Channel Bayport Flare and adjacent main stem, with dredged material to be transported to the Ocean Dredged Material Disposal Site. This is a preliminary market research announcement, not a Request for Proposal or Invitation for Bid, and no contract will be awarded from this sources sought notice. Interested parties must respond by November 3, 2025, and demonstrate experience as prime contractors for hopper dredging in deep draft navigation channels, with capability to produce at least 20,000 cubic yards per day using a hopper trailing suction dredge. The government is actively seeking responses from small businesses across multiple categories, including Section 8(a) firms, HUB-Zone businesses, Service-Disabled Veteran-Owned Small Businesses, Women-Owned Small Businesses, and Economically Disadvantaged enterprises to ensure adequate competition among responsible firms. Respondents must be registered in SAM.gov and should submit their information via email to the specified Army Corps of Engineers contacts; responses are voluntary with no reimbursement for costs incurred and no notification of evaluation results.
There is no set-aside designation for this procurement, and no incumbent contractor information is provided in the synopsis. The estimated construction price range is between $10,000,000 and $25,000,000, with a project completion timeline of 100 calendar days. The anticipated formal solicitation is scheduled to be issued in June 2026, with proposal submissions expected in July 2026 and contract award anticipated in September 2026. Contractors with experience navigating the unique traffic conditions of the Houston Ship Channel are preferred candidates for this dredging operation. Familiarity with hopper trailing suction dredge operations and deep draft navigation channel maintenance is critical for successful contract performance and proposal evaluation.
Notice text
SOURCES SOUGHT SYNOPSIS
TITLE: FY26 Houston Ship Channel – Bayport Flare Dredging
Notice Type: SOURCES SOUGHT SYNOPSIS
Source Sought Number: W912HY26X5507
Response Date (10 days): November 3, 2025
The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS ANNOUNCEMENT SEEKS INFORMATION FROM INDUSTRY, WHICH WILL BE USED FOR PRELIMINARY PLANNING PURPOSES. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE RESULTS OF THE EVALUATION.
The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition of responsible firms.
Project Information: FY26 Hopper Dredging of the Houston Ship Channel (HSC) Bayport Flare and adjacent main stem of the Houston Ship Channel. Material will be hauled to the Ocean Dredged Material Disposal Site (ODMDS). Contractor may be familiar with the traffic conditions of the Houston Ship Channel. Contractor may provide experience as a prime contractor for hopper dredging deep draft navigation channels. Contractor may also demonstrate experience producing at least 20,000 CY per day utilizing a hopper trailing suction dredge on a deep draft navigation dredging job.
The completion time of the work is 100 calendar days.
In accordance with DFARS 236.204, the estimated construction price range for this project is: Between $10,000,000 and $25,000,000.
All construction performance must comply with the USACE Safety and Health Requirements Manual (EM 385-1-1, and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations.
The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 million.
The Product Service Code is Z1KB.
Small Businesses are reminded under FAR 52.219-14, (Deviation 2021-O0008), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85% subcontract amount that cannot be exceeded.
Prior Government contract work is not required for submitting a response to this announcement.
Contractor may demonstrate any construction experience as a prime contractor working on Dredged Material Placement Areas.
Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award, and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.
If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the estimated amount of $4,100.00 for each calendar day of delay until the work is completed or accepted.
FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION:
1. Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ).
2. Name of firm w/ address, phone, fax, e-mail address, and point of contact.
3. Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman-Owned Small Business (WOSB).
4. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.
Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in:
a. Demonstrate experience in completing work outlined under the paragraph above for “Project Information.”
- Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past 5 years):
- Brief description of each project, customer name, and dollar value of the project)– provide at least 3 examples.
- Firm’s Bonding Capacity (Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars.
Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination.
Anticipated solicitation issuance date is on or about June 2026, and the estimated proposal/bid due date will be on or about July 2026. Estimated award on or about date is September 2026.The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/inviting firms to register electronically to receive a copy of the solicitation when it is issued.
Interested Firm’s shall respond to this announcement no later than November 3, 2025 at 10:00 AM (CDT). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Ms. Sarah Eisele at Sarah.M.Eisele@usace.army.mil and Mirian Tudor at Mirian.R.Tudor@usace.army.mil.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought FY26 HSC Bayport Flare Dredging W912HY26X5507 10-22-2025.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity