FY26 crrp USGS dock repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912HP26BA002
- Agency
-
ENDIST Charleston
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- St Stephens, SC 29479 29479
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Charleston District is soliciting bids for the demolition and replacement of the USGS Gage Platform 2, a construction project classified under heavy and civil engineering construction (NAICS 237990). The project encompasses three primary contract line items: mobilization and demobilization, removal and disposal of the existing USACE/USGS platform constructed from pressure-treated lumber supported on timber piles, and construction of the new USACE platform with land access via a single personnel access walkway for USGS and USACE personnel. The solicitation was originally posted on October 9, 2025, with two amendments subsequently issued—Amendment 0001 on November 5, 2025, modifying specifications in Appendix C Section 02 41 00, and Amendment 0002 on November 10, 2025, extending the proposal due date to November 17, 2025. Bids were opened on November 17, 2025, and all bidders were required to provide bid security and acknowledge the amendments.
This solicitation is designated as a Total Small Business set-aside, limiting competition to small business contractors. Five contractors submitted proposals with total bids ranging from $320,386.09 to $707,550.25, with GC Works submitting the lowest bid at $320,386.09 and Lorr Construction submitting the highest at $707,550.25. The project location is in St Stephen, South Carolina 29479, situated in the Upper Cooper River area. The contract involves coordination between multiple government entities, including USACE and USGS personnel who will require access to the completed platform. All submitted bids met the requirements for bid security and compliance with the solicitation amendments, indicating a competitive bidding process among qualified small business contractors.
Notice text
4 versions
Update #4 · Latest ·
FY26 CRRP USGS DOCK REPAIR - THE PURPOSE OF THIS PROJECT IS FOR THE DEMOLITION AND REPLACEMENT OF THE USGS GAGE PLATFORM 2. THE NEW PLATFORM SHALL HAVE LAND ACCESS FOR USGS AND USACE PERSONNEL VIA A SINGLE PERSONNEL ACCESS WALKWAY CONNECTING THE LAND TO THE PLATFORM. THE EXISTING PLATFORM AND LAND ACCESS FOR PEDESTRIANS ARE CONSTRUCTED WITH PRESSURE TREATED LUMBER SUPPORTED ON TIMBER PILES. THIS SOLICITATION IS HEREBY POSTED 9 OCTOBER 2025. AMENDMENT 0001 TO MAKE CHANGES TO THE SPECIFICATIONS APPENDIX C, SPECIFICATION SECTION 02 41 00. THIS AMENDMENT 0001 IS HEREBY POSTED 11.05.2025. AMENDMENT 0002 TO EXTEND THE PROPOSAL DUE DATE TO 17 NOVEMBER 2025. THIS AMENDMENT 0002 IS HEREBY POSTED 11.10.2025.
This signed abstract is hereby posted 18 November 2025
Update #3 ·
FY26 CRRP USGS DOCK REPAIR - THE PURPOSE OF THIS PROJECT IS FOR THE DEMOLITION AND REPLACEMENT OF THE USGS GAGE PLATFORM 2. THE NEW PLATFORM SHALL HAVE LAND ACCESS FOR USGS AND USACE PERSONNEL VIA A SINGLE PERSONNEL ACCESS WALKWAY CONNECTING THE LAND TO THE PLATFORM. THE EXISTING PLATFORM AND LAND ACCESS FOR PEDESTRIANS ARE CONSTRUCTED WITH PRESSURE TREATED LUMBER SUPPORTED ON TIMBER PILES. THIS SOLICITATION IS HEREBY POSTED 9 OCTOBER 2025. AMENDMENT 0001 TO MAKE CHANGES TO THE SPECIFICATIONS APPENDIX C, SPECIFICATION SECTION 02 41 00. THIS AMENDMENT 0001 IS HEREBY POSTED 11.05.2025. AMENDMENT 0002 TO EXTEND THE PROPOSAL DUE DATE TO 17 NOVEMBER 2025. THIS AMENDMENT 0002 IS HEREBY POSTED 11.10.2025.
Update #2 ·
FY26 CRRP USGS DOCK REPAIR - THE PURPOSE OF THIS PROJECT IS FOR THE DEMOLITION AND REPLACEMENT OF THE USGS GAGE PLATFORM 2. THE NEW PLATFORM SHALL HAVE LAND ACCESS FOR USGS AND USACE PERSONNEL VIA A SINGLE PERSONNEL ACCESS WALKWAY CONNECTING THE LAND TO THE PLATFORM. THE EXISTING PLATFORM AND LAND ACCESS FOR PEDESTRIANS ARE CONSTRUCTED WITH PRESSURE TREATED LUMBER SUPPORTED ON TIMBER PILES. THIS SOLICITATION IS HEREBY POSTED 9 OCTOBER 2025. AMENDMENT 0001 TO MAKE CHANGES TO THE SPECIFICATIONS APPENDIX C, SPECIFICATION SECTION 02 41 00. THIS AMENDMENT 0001 IS HEREBY POSTED 11.05.2025.
Update #1 ·
FY26 CRRP USGS DOCK REPAIR - THE PURPOSE OF THIS PROJECT IS FOR THE DEMOLITION AND REPLACEMENT OF THE USGS GAGE PLATFORM 2. THE NEW PLATFORM SHALL HAVE LAND ACCESS FOR USGS AND USACE PERSONNEL VIA A SINGLE PERSONNEL ACCESS WALKWAY CONNECTING THE LAND TO THE PLATFORM. THE EXISTING PLATFORM AND LAND ACCESS FOR PEDESTRIANS ARE CONSTRUCTED WITH PRESSURE TREATED LUMBER SUPPORTED ON TIMBER PILES. THIS SOLICITATION IS HEREBY POSTED 9 OCTOBER 2025.
Files
| File | Type | Posted |
|---|---|---|
| C.04.01 - Abstract 2025.11.17 - 26BA002 - FY26 CRRP USGS Dock Repair.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY26 crrp USGS dock repair | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Clouter Creek Middle and Highway Cell Diking | ENDIST Charleston | Total Small Business | |
| Gulf Coast Regional Hopper (OM26300) | ENDIST New Orleans | No set-aside | |
| USCG Station at Cape Disappointment | ENDIST Portland | No set-aside | |
| Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011) | ENDIST New Orleans | No set-aside | |
| Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity