FY26 Brunswick Inner Harbor Dredging Project

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912HN26BA008
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Brunswick Harbor, Ga.

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Savannah anticipates awarding a firm fixed price contract for maintenance dredging in Brunswick Harbor, Georgia, with a pre-solicitation response deadline of June 15, 2026. This acquisition is set aside 100% for Small Business.

The contract will involve furnishing personnel, transportation, mobilization and demobilization, equipment, and materials required for maintenance dredging. Work is located in the Brunswick Inner Harbor deep draft navigation project in Glynn County, Georgia, approximately 70 statute miles south of Savannah Harbor and 25 statute miles north of Fernandina Harbor. The channel is 36 feet deep MLLW and 400 feet wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River. Up to 835 thousand cubic yards of maintenance material is expected to be removed, with approximately 550,000 cubic yards anticipated from the East River. Work is traditionally performed with a hydraulic cutterhead dredge and is expected to span 120 days from notice to proceed.

Dredging areas include the East River (station 0+000 to 12+000), including the East River Turning Basin and transition areas; the South Brunswick River (station 0+000 to 7+000); the Lower Turtle River (station 34+000 to 43+000); and Brunswick River (station 22+000 to 26+000). The Inner Harbor is typically dredged in late summer or fall. NAICS code 237990 (Other Heavy and Civil Engineering Construction) applies; PSC code Z1KF (Maintenance Of Dredging Facilities).

Notice text

THIS IS A PRE-SOLICITATION: This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The Brunswick Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, and the duration is expected to be 120 days from notice to proceed. Up to 835 thousand cubic yards of maintenance material is expected to be removed from the inner harbor.The work is located in Brunswick Harbor Georgia deep draft navigation project. Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall. The dredging in the Brunswick Inner Harbor primarily takes place in the East River (station 0+000 to 12+000) which includes the East River Turning Basin and the Transition Areas leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (station 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that generally requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 34+000 to 43+000) and Brunswick River (station 22+000 to 26+000) in the Brunswick Inner Harbor are other areas that may require dredging and are primarily dredged when shoaling become problematic to navigation but are constantly monitored monthly. Approximately 550,000 cubic yards of material is anticipated to be removed from the East River, approximately 85,000 cubic yards of material is anticipated to be removed from the South Brunswick River, approximately 50,000 cubic yards of material is anticipated to be removed from the Brunswick River and approximately 10,000 cubic yards of material is anticipated to be removed from the Lower Turtle River this dredging cycle.The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.

Notice history

Notice Type Posted
FY26 Brunswick Inner Harbor Dredging Project Contract Award Award Award Notice
FY26 Brunswick Inner Harbor Dredging Project Latest solicitation Solicitation
This notice Pre-Solicitation
Sources Sought - FY26 Brunswick Inner Harbor Maintenance Dredging Project Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites NAICS 237990 ENDIST Savannah No set-aside
Winter Harbor Maintenance Dredging Mathews, Virginia, United States · NAICS 237990 ENDIST Norfolk No set-aside
Fort pierce harbor maintenance dredging, ST. Lucie county, florida NAICS 237990 ENDIST Jacksonville No set-aside
Annual Maintenance Dredging of Morehead City Inner Harbor Morehead City, North Carolina, United States · NAICS 237990 ENDIST Wilmington No set-aside
Pass-a-grille-pass, maintenance dredging, pinellas county, florida NAICS 237990 ENDIST Jacksonville Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity