FY25 Ludington and Pentwater Maintenance Dredging
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911XK26BA011
- Agency
-
ENDIST Detroit
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Ludington Harbor and Pentwater Harbor
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Detroit District is soliciting bids for FY25 Ludington and Pentwater maintenance dredging services. The project requires contractors to mobilize to both Ludington Harbor and Pentwater Harbor, perform dredging operations between specified upstream and downstream limits as shown in contract drawings, and place dredged material at designated placement sites. Upon completion, contractors must clean up and demobilize from the harbors, with optional re-mobilization to Pentwater Harbor in 2027 if options are exercised. The solicitation was posted on February 18, 2026, with a bid due date of March 20, 2026. Amendment 0001 was issued to provide revised Plan Sheets CN101 and CN102, which should be reviewed carefully by prospective bidders. The evaluation criteria and specific technical requirements are detailed in the contract drawings and specifications documents.
This is a Total Small Business set-aside contract, restricting competition to small business entities. Three contractors submitted bids, with Walsh Service Solutions LLC identified as the lowest bidder at a base contract amount of $1,689,205.00, which includes mobilization and demobilization costs of $518,281.00 along with required dredging operations. The contract includes seven option years for additional dredging work at both harbors, with option costs varying by contractor. The place of performance is Ludington, Michigan (Ludington, MI 49431). The project falls under NAICS code 237990 (Other Heavy and Civil Engineering Construction) and PSC code Y1KF (Construction of Dredging Facilities), indicating the specialized nature of the work required.
Notice text
3 versions
Update #3 · Latest ·
***Posting of the bid abstract.***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Update #2 ·
***Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102. Reference amendment documents for full details.***FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Update #1 ·
FY25 Ludington and Pentwater Maintenance Dredging. Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings. Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications. If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings. Upon completion of the work, clean-up and demobilize from the harbors. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY25 Ludington and Pentwater Maintenance Dredging | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity