About this opportunity

Paragraph 1:

The U.S. Army Corps of Engineers, Baltimore District is seeking bids for the FY24 maintenance dredging of approximately 2,500,000 cubic yards from the York Spit Federal Navigation Channel serving the Port of Baltimore. The work requires dredging to a depth of 50 feet MLLW with two feet of allowable overdepth, to be performed between November 2024 and March 2025 using a hopper dredge. The dredged material will be transported and placed at the designated Wolf Trap Alternative Placement Site Northern Extension quadrant 1 of cell NE-6. The Government Estimate for the work is $57,968,000.00. Bids are due by August 28, 2024.

Paragraph 2:

This solicitation does not use any set-aside designations. The estimated magnitude of construction is $25M-$100M. Two bids were received - Weeks Marine, Inc. ($36,108,500.00) and Great Lakes Dredge & Dock Company, LLC (no bid). The work will be performed within the heavy commercial waterways supporting the Port of Baltimore, with the place of performance being Cape Charles, VA 23310, USA.

Notice text

2 versions

Update #2 · Latest ·

***************************************************

ABSTRACT OF BIDS

****************************************************

The project consists of maintenance dredging approximately 2,500,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2024 through March 2025. The project consists of dredging portions of the York Spit Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 50 feet MLLW with two feet of allowable overdepth. Approximately 2,500,000 cy of material will be dredged including overdepth. Work shall be performed by a hopper dredge with all dredged material transported and placed in the designated Government-furnished placement area at Wolf Trap Alternative Placement Site Northern Extension quadrant 1 of cell NE-6. The estimated magnitude of construction is $25M-$100M. The work areas are within heavy commercial waterways supporting the Port of Baltimore. Large hopper dredges are required to remove the dredged material from the channel and haul the material to the placement site. The material will be dredged by hopper and placed within a period of performance of approximately 150 calendar days from receipt of Notice-to-Proceed.

Update #1 ·

The project consists of maintenance dredging approximately 2,500,000 cubic yards (cy) from the deep-draft federal navigation channel serving the Port of Baltimore. The work is to be performed between November 2024 through March 2025. The project consists of dredging portions of the York Spit Federal Navigation Channel. The work consists of maintenance dredging to a required depth of 50 feet MLLW with two feet of allowable overdepth. Approximately 2,500,000 cy of material will be dredged including overdepth. Work shall be performed by a hopper dredge with all dredged material transported and placed in the designated Government-furnished placement area at Wolf Trap Alternative Placement Site Northern Extension quadrant 1 of cell NE-6. The estimated magnitude of construction is $25M-$100M. The work areas are within heavy commercial waterways supporting the Port of Baltimore. Large hopper dredges are required to remove the dredged material from the channel and haul the material to the placement site. The material will be dredged by hopper and placed within a period of performance of approximately 150 calendar days from receipt of Notice-to-Proceed.

Files

File Type Posted
Abstract of Bids W912DR24B0003 Dredging York Spit.pdf PDF

Notice history

Notice Type Posted
FY24 Baltimore Harbor and Channels Maintenance Dredging, York Spit Channel, Chesapeake Bay, MD Award Award Notice
This notice Latest solicitation Solicitation
FY24 Baltimore Harbor and Channels Maintenance Dredging, York Spit Channel, Chesapeake Bay, MD Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging 70601 · NAICS 237990 ENDIST Wilmington No set-aside
W912EE27BA002 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ Waterway Vicksburg, Mississippi 39183, United States · NAICS 237990 ENDIST Vicksburg No set-aside
Mid-Bay James Island Restoration Phase 2 Dorchester County, Maryland 21634 · NAICS 237990 ENDIST Baltimore No set-aside
FY27 Texas City Ship Channel Main Channel and Turning Basin Galveston, Texas, United States · NAICS 237990 ENDIST Galveston No set-aside
FY26 Willapa Harbor Maintenance Dredging Washington, United States · NAICS 237990 ENDIST Seattle No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors