FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912HN22B5005
- Agency
-
ENDIST Savannah
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Savannah seeks maintenance dredging services along the Atlantic Intracoastal Waterway through Solicitation W912HN22B5005. The contractor will remove an estimated 750,000 cubic yards of sediment from multiple sites over 273 days using a hydraulic cutterhead dredge. The solicitation requires offerors to provide all personnel, equipment, transportation, and materials to complete the dredging and disposal work. Proposals are due August 30, 2022 and the agency will award to the responsible bidder whose offer conforms to the solicitation and is most advantageous to the government considering price and technical factors.
The opportunity is set aside for total small business and has a place of performance along the Atlantic Intracoastal Waterway in Georgia and South Carolina. Key details include removing approximately 750,000 cubic yards of material over 273 days from locations designated as Shoal 4, Shoal 7, and placement areas 1717C-P and 2536C-P as depicted in contract drawings. The estimated value ranges from $5-10 million based on prior awards for similar requirements to incumbent contractors performing maintenance dredging for the U.S. Army Corps of Engineers along this waterway.
Notice text
8 versions
Update #8 · Latest ·
NOTE: A revised abstract has been posted. The abstract has been uploaded. Amendment 0004 in PIEE (lableled Amendment 0003 on SF30) includes specifications and drawing changes. Amendment 0003 in PIEE (labled Amendment 0002 on SF30) changes the bid opening date from 23 August 2022 to 30 August 2022 and adds the number of days after Notice of Proceed (NTP) to subCLINS 0008AA and 0008AB. Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #7 ·
NOTE: The abstract has been uploaded. Amendment 0004 in PIEE (lableled Amendment 0003 on SF30) includes specifications and drawing changes. Amendment 0003 in PIEE (labled Amendment 0002 on SF30) changes the bid opening date from 23 August 2022 to 30 August 2022 and adds the number of days after Notice of Proceed (NTP) to subCLINS 0008AA and 0008AB. Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #6 ·
NOTE: Amendment 0004 in PIEE (lableled Amendment 0003 on SF30) includes specifications and drawing changes. Amendment 0003 in PIEE (labled Amendment 0002 on SF30) changes the bid opening date from 23 August 2022 to 30 August 2022 and adds the number of days after Notice of Proceed (NTP) to subCLINS 0008AA and 0008AB. Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #5 ·
NOTE: Amendment 0003 in PIEE (labled Amendment 0002 on SF30) changes the bid opening date from 23 August 2022 to 30 August 2022 and adds the number of days after Notice of Proceed (NTP) to subCLINS 0008AA and 0008AB. Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #4 ·
NOTE: Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #3 ·
Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #2 ·
Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Update #1 ·
The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging | Award Notice | |
| This notice | Solicitation | |
| FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging | Pre-Solicitation |