FTQW 23-5100 Repair Hangar Door
Closed Pre-Solicitation Posted
- Solicitation number
- FA5004-24-R-FTQW23-5100
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Eielson AFB, Alaska 99702, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking proposals for the repair of hangar doors under a three-phase contract. Phase II will involve developing a corrective action plan, including a technical approach, pricing, and schedule for the Phase III corrective actions. Phase III will require engineering, procurement, and field implementation to return the doors to full operational service, complying with all applicable codes and regulations. The corrective action plan must consider operational needs and include incremental actions, if possible, to provide minimal functionality prior to final implementation. Air Force approval of the corrective action plan is required before advancing to Phase III. Proposals will be evaluated based on the quality of the technical approach, pricing, and schedule.
This contract is set aside for HUBZone small businesses. The total value of the contract is unknown, but the work will be completed in two phases following the initial Phase I. No information is provided about any current or previous contractors for this requirement.
Notice text
Phase I of this contract is currently being completed. This posting is regarding phases II and III of this project.
Phase II:
• Utilize the field survey to develop a corrective action plan for the hangar doors.
• Corrective action plan shall include development of a complete proposal to include 1) technical approach, 2) pricing, and 3) schedule for Phase III corrective actions as described below.
• Corrective action plan shall take operational considerations into effect and shall include incremental actions, if possible, to provide minimal functionality to meet operational needs prior to the implementation of final corrective actions.
• NOTE: Air Force Approval of the corrective action plan is required prior to advancement to phase III.
Phase III:
• Perform any required engineering and procurement activities in advance of field door work.
• Field implementation of the door corrective action plan to remove and replace hangar door components as prescribed to return the doors to service and return complete functionality for their intended purpose.
• Phase III shall include compliance with all applicable codes, standards, and regulations.
• At the completion of corrective actions, final operational testing confirming the doors operation will be performed. This testing will be witnessed by designated Air Force representatives..
• User training for the door operation and maintenance will be performed.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ID- kooskia NFH-overhead door replace | — | Total Small Business |