FSR 1107 Anderson Road Decommissioning

Award Notice Posted

Solicitation number
AG-05M6-S-13-0026
Agency
Awarded
to Dills Construction
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-05M6-C-13-0018 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
2930 Wetmore Ave., Suite 3A Everett, Washington 98201, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

PROJECT DESCRIPTION
Anderson Road Decommissioning (FSR1107)-The intent of this construction contract is to provide Road Decommissioning for a portion of Forest Service Road (FSR) 1107 on the Mt. Baker-Snoqualmie National Forest (Mt. Baker Ranger District). The project consists of removing existing culverts and restoring the pre-existig stream channel or constructing a drainage dip as well as constructing a road closure berm. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required to repair the road according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

ESTIMATED DATE SOLICITATION WILL BE ISSUED
July 29, 2013


PROJECT LOCATION
From Burlington, Washington, proceed East on State Route 20 for 35 miles to the intersection "Baker Lake Road". Proceed North on Baker lake road 11.5 miles to the intersection of FSR 1106 on right. Proceed East on FSR 1106 approx. 2 miles crossing the Baker Lake Dam. ¼ mile past the Baker Lake Dam, the road will become FSR 1107. Proceed on FSR 1107 for approx. 8.9 miles until reaching the junction of FSR 1107022. Beginning of Project is located along FSR 1107 at MP 9.8 in Township 37 North, Range 9 East, Section 32.


PROJECT MAPS & DRAWINGS
The project maps and drawings are attached.

MAGNITUDE OF CONSTRUCTION PROJECT (FAR 36.204)
Less than $25,000.00


PERFORMANCE, PAYMENT, AND BID BONDS
Not Required


ESTIMATED TIME TO COMPLETE PROJECT
30 Calendar Days


ESTIMATED DATE TO START PROJECT
August 2013


PRE-BID MEETING
Will not be held


POINTS OF CONTACT
Business Team: Brian A. Johnson, Contracting Officer, (425) 783-6056, bajohnson03@fs.fed.us


Technical Team: James B. Mitchell, North Zone Team Leader/Roads Manager, (360) 854-2620, jbmitchell@fs.fed.us

Update #1 ·

PROJECT DESCRIPTION
Anderson Road Decommissioning (FSR1107)-The intent of this construction contract is to provide Road Decommissioning for a portion of Forest Service Road (FSR) 1107 on the Mt. Baker-Snoqualmie National Forest (Mt. Baker Ranger District). The project consists of removing existing culverts and restoring the pre-existig stream channel or constructing a drainage dip as well as constructing a road closure berm. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required to repair the road according to the drawings and specifications of the contract. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

ESTIMATED DATE SOLICITATION WILL BE ISSUED
July 24, 2013


PROJECT LOCATION
From Burlington, Washington, proceed East on State Route 20 for 35 miles to the intersection "Baker Lake Road". Proceed North on Baker lake road 11.5 miles to the intersection of FSR 1106 on right. Proceed East on FSR 1106 approx. 2 miles crossing the Baker Lake Dam. ¼ mile past the Baker Lake Dam, the road will become FSR 1107. Proceed on FSR 1107 for approx. 8.9 miles until reaching the junction of FSR 1107022. Beginning of Project is located along FSR 1107 at MP 9.8 in Township 37 North, Range 9 East, Section 32.


PROJECT DRAWINGS
The attached drawings are for information and planning purposes only. The final drawings will be provided with the formal solicitation that will be issued on or around July 24, 2013.


MAGNITUDE OF CONSTRUCTION PROJECT (FAR 36.204)
Less than $25,000.00


PERFORMANCE, PAYMENT, AND BID BONDS
Not Required


ESTIMATED TIME TO COMPLETE PROJECT
30 Calendar Days


ESTIMATED DATE TO START PROJECT
August 2013


PRE-BID MEETING
Will not be held


POINTS OF CONTACT
Business Team: Brian A. Johnson, Contracting Officer, (425) 783-6056, bajohnson03@fs.fed.us


Technical Team: James B. Mitchell, North Zone Team Leader/Roads Manager, (360) 854-2620, jbmitchell@fs.fed.us

Files

File Type Posted
Quoter's_Copy_to_Submit.pdf PDF
AG-05M6-S-13-0026_(FBO_Version).pdf PDF
FSR_1107_Plans.pdf PDF