Freight Elevator Security Cabling Installation – Government Publishing Office
Closed Special Notice Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- 040ADV-25-Q-0015-C0002
- Agency
-
Government Publishing Office
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- District of Columbia 20001, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Government Publishing Office has issued a Special Notice regarding an amendment to a solicitation for freight elevator security cabling installation at their Washington, DC facility. This amendment updates the original solicitation 040ADV-25-Q-0015 to modify cabling specifications and correct performance period details for a security camera installation project. The work involves installing necessary security camera cabling in three freight elevators that currently lack proper wiring infrastructure. The project is located at 732 North Capitol Street, NW, Washington, DC, and falls under the NAICS code for Electrical Contractors and Other Wiring Installation Contractors. The opportunity is posted as a Special Notice with no set-aside designation, indicating it is open to all eligible contractors.
The primary purpose of this amendment is to update the dimensional requirements for cabling needed for Elevators 39 and 40, while also correcting the period of performance specifications outlined in Section F of the original solicitation. Contractors interested in this opportunity must respond by June 16, 2025, providing them with a six-day window from the posting date. The technical requirements include installing 125 feet of UL-rated conductor for Elevator 34 and 300 feet of UL-rated travel cables with specific 5 x 18-gauge shielded conductors for Elevators 39 and 40. The selected contractor will have 45 calendar days from the Notice to Proceed to complete all installation work. All contractors must comply with GPO facility safety standards and operational requirements, while being responsible for protecting the installed cabling throughout the project duration.
Notice text
The purpose of this amendment is to (1) update the dimensions of the cabling required for Elevators 39 and 40 and to (2) correct the period of performance under Section F.
Files
| File | Type | Posted |
|---|---|---|
| 040ADV-25-Q-0015-C0002.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Freight Elevator Security Cabling Installation – Government Publishing Office | Special Notice | |
| This notice | Special Notice | |
| Freight Elevator Security Cabling Installation – Government Publishing Office | Special Notice | |
| Freight Elevator Security Cabling Installation – Government Publishing Office | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity