Freeport Floating Pier Pile Extension

Closed Solicitation Posted

Solicitation number
70Z02925Q0006
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Freeport, Texas 77541, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Coast Guard is seeking qualified contractors to extend seven piles on a floating dock at Station Freeport, Texas. The solicitation requires contractors to provide all labor, materials, and equipment necessary for the pier pile extension project. Specific technical requirements include drilling 12-inch deep holes, setting #5 dowels in epoxy, installing #3 ties vertically, and pouring new 5000 PSI concrete pile extensions measuring 6 feet in height. The contract will be awarded using a Lowest Price Technically Acceptable (LPTA) evaluation method, with quotes due by February 3, 2025, at 2:00 PM local time. Potential bidders are strongly encouraged to visit the facility and conduct field measurements prior to submitting their quotes, and must be registered in SAM.gov to be eligible.

The contract is 100% set aside for small businesses under NAICS code 237990 (Docks Builders), with a size standard of $19 million. The period of performance is 45 calendar days after receiving the notice to proceed, with work expected to commence within 10 days of the notice. Contractors must perform at least 25% of the work using their own forces, and quotes should be submitted directly to melissa.n.navarro@uscg.mil. The place of performance is located in Freeport, TX 77541, and a pre-construction conference will be held after the contract is awarded. While specific budget details are not explicitly stated, the solicitation indicates this will be a firm-fixed price purchase order targeting small businesses with expertise in dock construction and repair.

Notice text

The United States is accepting quotes for qualified individuals or firms to provide the Coast Guard with all labor, materials, and equipment necessary to extend seven piles on a floating dock at Station Freeport. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Freeport.

Files

File Type Posted
70Z02925QNEW0006.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors