Fort Peck Toe Drain Outfall Repair and Monitoring System

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W9128F23B0002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Peck, Montana 59223, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is seeking a contractor to remove and replace the existing drain outfall perforated pipe and monitoring system at the downstream toe of the dam at Fort Peck in Montana. The Department of the Army Corps of Engineers Engineering District Omaha will evaluate proposals. The successful contractor must provide all personnel, equipment, vehicles, and supervision necessary to complete the dewatering, excavation, demolition, installation of new pipes, placement of filter material, backfill, installation of a manhole, and sodding/seeding. Proposals are due by December 6, 2022. A site visit will be held on November 17, 2022 at 1:00 PM Mountain Time at the Fort Peck Project Office in Fort Peck, Montana.

This opportunity is set aside for total small businesses. The NAICS code is 237990 and PSC code is C411. No incumbent or current contractor is named. The pre-solicitation notice does not provide possible award values or budget ranges, or specify timelines or quantities for the required goods and services.

Notice text

2 versions

Update #2 · Latest ·

PRESOLICITATION NOTICE:  On or about 3 November 2022, a solicitation will be posted to SAM.GOV for the Fort Peck Toe Drain Outfall Repair and Monitoring System.

The contractor shall provide all personnel, equipment, tools, vehicles, supervision, and other items necessary to remove and replace the existing drain outfall perforated pipe and monitoring system at the downstream toe of the dam. The work will include but not limited to dewatering of the area if required, excavation, demolition, installation of new pipes, placement of new filter material, backfill, installation of manhole, and sodding and seeding.

The Contract Method: 2-Step IFB. 

Tentative Site Visit Date and Time: 17-Nov-2022 / 1:00 PM MT                                                        Site Visit Location: Fort Peck Project Office Ft. Peck Montana.

Update #1 ·

PRESOLICITATION NOTICE:

The contractor shall provide all personnel, equipment, tools, vehicles, supervision, and other items necessary to remove and replace the existing drain outfall perforated pipe and monitoring system at the downstream toe of the dam. The work will include but not limited to dewatering of the area if required, excavation, demolition, installation of new pipes, placement of new filter material, backfill, installation of manhole, and sodding and seeding.

The Contract Method: 2-Step IFB. 

Tentative Site Visit Date and Time: 17-Nov-2022 / 1:00 PM MT                                                        Site Visit Location: Fort Peck Project Office Ft. Peck Montana.

Notice history

Notice Type Posted
Fort Peck Toe Drain Outfall Repair and Monitoring System Award Award Notice
Fort Peck Toe Drain Outfall Repair and Monitoring System Latest special notice Special Notice
Fort Peck Toe Drain Outfall Repair and Monitoring System Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Bonneville Powerhouse II Unwatering Pump Replacement United States · NAICS 237990 ENDIST Portland Total Small Business
W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning Foster Dam, Linn County, Oregon 93745 · NAICS 237990 ENDIST Portland Total Small Business
St Francis Town Levee Renovation Saint Francis, Arkansas, United States · NAICS 237990 ENDIST Memphis No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors