Fort Peck Power House 1 Draft Tube Stoplog Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F23R0002
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
- Place of performance
- Fort Peck, Montana 59223, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the replacement of draft tube stoplogs and lifting beams at Fort Peck Dam Powerhouse #1, to be issued by the Department of the Army Corps of Engineers Omaha District. The solicitation will require commencement of work upon award and completion within 450 days of the notice to proceed. All questions must be submitted through ProjNet, and proposals will be evaluated for best value. The notice to proceed and final proposal due date will be included in the forthcoming solicitation scheduled for release on April 17, 2023.
The opportunity is set aside for total small businesses. The primary NAICS code is 237990 for other heavy and civil engineering construction with a $45 million size standard. The estimated construction cost ranges from $500,000 to $1,000,000. A site visit is tentatively scheduled for April 27, 2023 to provide additional details to interested offerors prior to the May 17, 2023 proposal due date.
Notice text
On or about 17 April 2023, the Government intends to issue a solicitation for “Fort Peck Power House 1 Draft Tube Stoplog Replacement”. The solicitation will close on or about 17 May 2023. The solicitation is restricted to Small Businesses.
Site Visit:
A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is tentatively scheduled for 27 April 2023.
Project Description:
The work includes the replacement of the draft tube stoplogs and lifting beam at Fort Peck Dam, Powerhouse #1. The 115 kV line will require an outage before a mobile crane is used to move stoplogs to he stoplog slots. The work also includes replacing the dogging devices in each stoplog slot.
The Contractor will be required to commence work upon receipt of contract award and complete the work 450 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $500,000 and $1,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237990, Other Heavy and Civil Engineering Construction, with a size standard for Small Business of $45M.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).
- Use the ‘All Award Data' to locate the project (by entering the solicitation number.
- By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
- Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.
Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance).
Place of Performance:
Fort Peck Dam
Fort Peck, Montana 59223
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fort Peck Power House 1 Draft Tube Stoplog Replacement | Award Notice | |
| Fort Peck Power House 1 Draft Tube Stoplog Replacement | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| New Lock Stoplogs | ENDIST Detroit | Total Small Business | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business | |
| LLA Navigation Lock Switchgear | ENDIST Walla Walla | Total Small Business | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity