Fort Peck High Resistance Grounding Equipment - Supply
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F20Q0025
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335313 Switchgear and Switchboard Apparatus Manufacturing
- PSC
- 6110 Electrical Control Equipment
- Place of performance
- Fort Peck MT 59223 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking offers for a high resistance grounding system to be installed at Fort Peck Dam Powerhouse in Montana. The Department of the Army Corps of Engineers Engineering District Omaha intends to issue a solicitation on or about May 18, 2020 for the replacement of generator neutral breakers and reactors with a new high resistance grounding system across all 5 units. The system aims to limit unit fault currents and reduce damage to generator cables from single line ground faults. Delivery of the high resistance grounding equipment is required within 18 months of contract award. The final solicitation will be posted on www.fbo.gov with proposals due on or around June 4, 2020.
There is no set-aside designated for this procurement. Offerors will need to ensure their registrations are current in the System for Award Management database. No incumbent contractor or budget details were provided, but the scope involves replacing equipment across all 5 generator units at the Fort Peck Dam Powerhouse in Montana. Interested parties should monitor www.fbo.gov using the provided search details and project number.
Notice text
2 versions
Update #2 · Latest ·
UPDATE: On or abou 8 June 2020, the Government intends to issue a solicitation for Ft. Peck High Resistance Grounding Equipment. The solicitation will close on or about 2 July 2020. The solicitation is Unrestricted Competition and Open to Both Large and Small Business Participants.
Pre-Solicitation
On or about 18 May 2020, the Government intends to issue a solicitation for Ft Peck High Resistance Grounding Equipment. The solicitation will close on or about 4 June 2020. The solicitation is Unrestricted Competition and Open to Both Large and Small Businesses Participation.
Project Description:
Fort Peck Dam, situated along the Missouri River, has a hydroelectric generating facility with a nameplate capacity of 185 MW divided between Powerhouse 1 and Powerhouse 2. Fort Peck Dam will replace the low impedance reactor and breaker with a high impedance ground since the reactor and the neutral breaker have reached the end of their useful life; the project would like to limit unit fault currents.
This is a supply purchase at Fort Peck Dam Powerhouse for the replacement of generator neutral breakers and reactors with a modern high resistance grounding (HRG) system and cable voltage suppressors. The HRG will reduce the damage to the cables and to the generator caused by single line to ground faults which are the most common type of fault in generators and cables. This project will be for all 5 Units at Fort Peck. This purchase will be for the HRGs only. The installation will be completed by the federal employees at Ft. Peck Dam, MT.
The HRGs shall be delivered 18-months after award of contract.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).
Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
- Use the ‘Quick Search’ to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities’ (large arrow in the middle of the page) or use the ‘Opportunities’ tab followed by the ‘Advanced Search’ tab.
- By using the ‘login’ feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
- Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files’ or from the ‘Packages’ tab.
- If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors’ tab and then ‘Add me to Interested Vendors’ link at the bottom of the page.
Delivery Location:Fort Peck Dam Powerhouse, Montana
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Registration is required to access solicitation documents.
Update #1 ·
Pre-Solicitation
On or about 18 May 2020, the Government intends to issue a solicitation for Ft Peck High Resistance Grounding Equipment. The solicitation will close on or about 4 June 2020. The solicitation is Unrestricted Competition and Open to Both Large and Small Businesses. Participation.
Project Description:
Fort Peck Dam, situated along the Missouri River, has a hydroelectric generating facility with a nameplate capacity of 185 MW divided between Powerhouse 1 and Powerhouse 2. Fort Peck Dam will replace the low impedance reactor and breaker with a high impedance ground since the reactor and the neutral breaker have reached the end of their useful life; the project would like to limit unit fault currents.
This is a supply purchase at Fort Peck Dam Powerhouse for the replacement of generator neutral breakers and reactors with a modern high resistance grounding (HRG) system and cable voltage suppressors. The HRG will reduce the damage to the cables and to the generator caused by single line to ground faults which are the most common type of fault in generators and cables. This project will be for all 5 Units at Fort Peck. This purchase will be for the HRGs only. The installation will be completed by the federal employees at Ft. Peck Dam, MT.
The HRGs shall be delivered 18-months after award of contract.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).
Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
- Use the ‘Quick Search’ to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities’ (large arrow in the middle of the page) or use the ‘Opportunities’ tab followed by the ‘Advanced Search’ tab.
- By using the ‘login’ feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
- Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files’ or from the ‘Packages’ tab.
- If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors’ tab and then ‘Add me to Interested Vendors’ link at the bottom of the page.
Delivery Location:Fort Peck Dam Powerhouse, Montana
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Registration is required to access solicitation documents.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fort Peck High Resistance Grounding Equipment - Supply | Award Notice | |
| Fort Peck High Resistance Grounding Equipment - Supply | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| High Voltage Power Supplies (HVPS) for Electronic Fish Barriers | ENDIST Chicago | No set-aside | |
| Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT | ENDIST New England | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity