Fort Gibson Turbine Maintenance Platform (TMP)
Closed Pre-Solicitation Posted
- Solicitation number
- Sawicki0002
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332323 Ornamental and Architectural Metal Work Manufacturing
- Place of performance
- Fort Gibson, Oklahoma 74434, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Tulsa is seeking to procure a turbine maintenance platform (TMP) for the Fort Gibson Powerhouse main unit turbines. The project involves fabricating and load testing one new TMP made from aluminum and steel, with specific requirements including sheet, plate, extrusions, and structural shapes. An assembly specialist will be required to support the initial on-site assembly, providing clarification and making necessary field adjustments. The procurement is categorized under NAICS code 332323 for Ornamental and Architectural Metal Work Manufacturing, with a small business size standard of 500 employees. Interested contractors must submit a 5-page Experience/Capabilities Statement electronically by May 13, 2025, at 2:00 PM CDT, and must be registered in the System of Award Management (SAM).
The solicitation is open to multiple business types, including Small Businesses, Section 8(a), HUBZone, Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and Large Businesses. While no specific set-aside has been designated, the procurement allows for broad participation across different business categories. The contract requires respondents to provide three relevant project examples from the past three years demonstrating experience with turbine maintenance platforms. Contractors will need to detail their capabilities, potential teaming arrangements, and technical competence in metal fabrication and platform assembly. The project is anticipated to be solicited in May 2025, with the final deliverable being a complete TMP ready for installation at the Fort Gibson Powerhouse, including on-site assembly support and field adjustments.
Notice text
2 versions
Update #2 · Latest ·
See attachment.
Update #1 ·
The work includes fabrication and load testing of one new turbine maintenance platform (TMP) for the Fort Gibson Powerhouse main unit turbines ready for installation as specified and as shown in the contract drawings. Deliver all fabricated items complete to the Fort Gibson Powerhouse. The TMP will be fabricated from aluminum and steel including, but not limited to, aluminum sheet and plate, extrusions, and structural shapes. Provide a competent assembly specialist during the first at-site assembly (this assembly will be performed by Project personnel). The assembly specialist will be responsible to clarify assembly instructions, check the assembly, and make any field adjustments necessary to correctly assemble the TMP.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice_Fort Gibson Turbine Maintenance Platform_29 April 2025.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside | |
| Webbers Falls Excitation System Replacements | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity