Fort Gibson Replace Spillway Bridge
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912BV25RA017
- Agency
- ENDIST Tulsa US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- 74434
- Points of contact
-
- Tyler Godwin tyler.l.godwin@usace.army.mil (918) 669-7281
- Dario Rissone dario.m.rissone@usace.army.mil (918) 669-7109
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Tulsa is soliciting proposals for the replacement of the spillway bridge at Fort Gibson. This construction project falls under the Highway, Street, and Bridge Construction NAICS category and involves comprehensive bridge replacement work requiring specialized construction expertise. The solicitation has undergone multiple amendments (AM0001 through AM0004), with revisions to specifications, drawings, wage determinations, and the inclusion of a coring report to provide additional technical details for bidders. A pre-bid site visit was conducted on August 18, 2025, at 2:00 PM CST, with a sign-in sheet documenting attendance from various engineering and construction companies. The proposal submission deadline is September 29, 2025, providing contractors with adequate time to prepare comprehensive bids following the site visit and review of updated documentation.
This opportunity does not utilize any set-aside designation, making it available to all qualified contractors capable of performing bridge construction work. The place of performance is located in Fort Gibson, Oklahoma 74434, requiring contractors to mobilize resources and personnel to this specific geographic location. The solicitation documents indicate significant technical complexity, as evidenced by the multiple specification revisions, updated drawings, and the provision of a coring report that likely contains subsurface investigation data critical for foundation and structural design considerations. The pre-bid conference attendance suggests strong industry interest, with multiple companies participating in the information gathering process. While specific contract values, timelines, or quantities are not detailed in the available information, the comprehensive nature of the documentation and amendment process indicates this is likely a substantial infrastructure project requiring experienced bridge construction contractors with appropriate bonding and technical capabilities.
Notice text
6 versions
Update #6 · Latest ·
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details. *AM0003, This Amendment provides a revised section 00 22 11, multiple revised specifications sections and drawings/plans. Please see attachments for full details. *AM0004, This Amendment is to update the Wage Determinations for this requirement. Please see attachments for full details
Update #5 ·
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details. *AM0003, This Amendment provides a revised section 00 22 11, multiple revised specifications sections and drawings/plans. Please see attachments for full details.
Update #4 ·
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details.
Update #3 ·
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details.
*UPDATE - The Pre-bid Site Visit sign-in sheet has been provided in the attachments.
Update #2 ·
Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details.
Update #1 ·
Fort Gibson Replace Spillway Bridge
Attachments
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fort Gibson Replace Spillway Bridge | Award Notice | |
| Fort Gibson Replace Spillway Bridge | Solicitation | |
| Fort Gibson Replace Spillway Bridge | Pre-Solicitation | |
| Fort Gibson Replace Spillway Bridge | Special Notice | |
| Fort Gibson Replace Spillway Bridge | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity