Fort Gibson Replace Spillway Bridge

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912BV25RA017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
74434

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Tulsa is soliciting proposals for the replacement of the spillway bridge at Fort Gibson. This construction project falls under the Highway, Street, and Bridge Construction NAICS category and involves comprehensive bridge replacement work requiring specialized construction expertise. The solicitation has undergone multiple amendments (AM0001 through AM0004), with revisions to specifications, drawings, wage determinations, and the inclusion of a coring report to provide additional technical details for bidders. A pre-bid site visit was conducted on August 18, 2025, at 2:00 PM CST, with a sign-in sheet documenting attendance from various engineering and construction companies. The proposal submission deadline is September 29, 2025, providing contractors with adequate time to prepare comprehensive bids following the site visit and review of updated documentation.

This opportunity does not utilize any set-aside designation, making it available to all qualified contractors capable of performing bridge construction work. The place of performance is located in Fort Gibson, Oklahoma 74434, requiring contractors to mobilize resources and personnel to this specific geographic location. The solicitation documents indicate significant technical complexity, as evidenced by the multiple specification revisions, updated drawings, and the provision of a coring report that likely contains subsurface investigation data critical for foundation and structural design considerations. The pre-bid conference attendance suggests strong industry interest, with multiple companies participating in the information gathering process. While specific contract values, timelines, or quantities are not detailed in the available information, the comprehensive nature of the documentation and amendment process indicates this is likely a substantial infrastructure project requiring experienced bridge construction contractors with appropriate bonding and technical capabilities.

Notice text

6 versions

Update #6 · Latest ·

Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details. *AM0003, This Amendment provides a revised section 00 22 11, multiple revised specifications sections and drawings/plans. Please see attachments for full details. *AM0004, This Amendment is to update the Wage Determinations for this requirement. Please see attachments for full details

Update #5 ·

Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details. *AM0003, This Amendment provides a revised section 00 22 11, multiple revised specifications sections and drawings/plans. Please see attachments for full details.

Update #4 ·

Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details. *AM0002, This Amendment provides a revised section 00 22 11, revised Drawings/Plans set, and Coring Report. Please see attachments for full details.

Update #3 ·

Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details.

*UPDATE - The Pre-bid Site Visit sign-in sheet has been provided in the attachments. 

Update #2 ·

Fort Gibson Replace Spillway Bridge - *AM0001, This Amendment pushes the site visit back 1 hour, to 2:00 PM CST on 18 AUG 2025. This Amendment also updates section 01 45 00, please see attachments for full details.

Update #1 ·

Fort Gibson Replace Spillway Bridge

Files

File Type Posted
Site Visit Sign In Sheet.pdf PDF

Notice history

Notice Type Posted
Fort Gibson Replace Spillway Bridge Award Award Notice
This notice Latest solicitation Solicitation
Fort Gibson Replace Spillway Bridge Pre-Solicitation
Fort Gibson Replace Spillway Bridge Special Notice
Fort Gibson Replace Spillway Bridge Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Webbers Falls Excitation System Replacements NAICS 237990 ENDIST Tulsa No set-aside
Cisco Branch Ontonagon River Bridge Replacement Watersmeet, Michigan 49969, United States · NAICS 237310 Forest Service Total Small Business
YELL 338223 - Bridge Preservation NAICS 237310 National Office No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business
Tenkiller Hydropower Excitation System Replacement Gore, Oklahoma, United States · NAICS 237990 ENDIST Tulsa No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity