About this opportunity
The Department of the Army Corps of Engineers Engineering Support Center Huntsville seeks energy and water conservation services for Fort Moore, Georgia, with proposals due July 29, 2026. This is a UESC (Utility Energy Services Contract) procurement to acquire energy and water conservation measures that reduce consumption and associated utility costs, reduce energy and water-related maintenance, repair and replacement costs, and may enhance security and resilience of energy and water systems through technologies including but not limited to distributed generation, energy storage, and continual commissioning.
Place of performance is Fort Moore, GA 31905. The implementation period runs from contract award through complete installation, operationalization, and PCO acceptance of all energy conservation measures. MRR savings must be directly related to implemented conservation measures. The NAICS code is 541330, Engineering Services, and the PSC code is R425, Support–Professional: Engineering/Technical.
Notice text
The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Presolicitation Notice Fort Benning, GA | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Notice of Opportunity (NOO) U. S. Army Reserve, 88th Readiness Division Energy Savings Performance Contract (ESPC) | Energy | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity