Forrest sherman FY26 DMP 113N and 125N

Awarded Limited / Sole Source Justification Posted

Solicitation number
N50054_26108
Agency
Set-aside
No set-aside

Opportunity facts

Contract number
N0002426C4403 Federal contract award
NAICS code
336611 Ship Building and Repairing
Place of performance
Norfolk, Virginia 23523, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Sea Systems Command awarded a sole-source modification to BAE Systems, Norfolk, VA under contract N00024-26-C-4403 on November 10, 2025 for overhaul of the #1 and #2 Fuel Oil Purifiers on the USS FORREST SHERMAN (DDG 98), with an estimated cost of $146,089.

The justification invokes 10 U.S.C. 3204(a)(2) and FAR 6.302-2(a)(2) based on unusual and compelling urgency. The Navy Fleet Commander directed removal of fuel oil purifier parts from FORREST SHERMAN to support USS McFaul's deployment commitments, rendering the purifiers inoperable. These systems are essential to the ship's propulsion and power generation. FORREST SHERMAN has an availability end date of August 10, 2027 and an immediate follow-on deployment thereafter. BAE Systems is the only practicable contractor because the vessel is currently in BAE's dry-dock; engaging an alternate contractor would impose additional costs, scheduling delays, and coordination burdens that would jeopardize the ship's operational commitments. Work must commence no later than June 8, 2026 and will be performed in accordance with Specification Items 541-22-004 and 541-22-002, utilizing Fiscal Year 2026 Operation and Maintenance, Navy funds. The Contracting Officer determined the anticipated cost fair and reasonable based on historical data, an Independent Government Estimate, and BAE's fully burdened ship repair labor and material rates established at contract award. Place of performance is Norfolk, Virginia.

Notice text

The work to be performed pursuant to this procurement consists of performing the following work on the USS FORREST SHERMAN (DDG 98):
Overhaul of #1 Fuel Oil Purifier, in accordance with Specification Item 541-22-004 and Overhaul of #2 Fuel Oil Purifier, in accordance with Specification Item 541-22-002. The work will be accomplished utilizing Fiscal Year 2026 Operation and Maintenance, Navy (OPN) funds in the estimated amount of (REDACTED). The work must commence no later than (REDACTED) to allow the Prime Contractor to plan and integrate it into the existing large and complex work package. The Government’s minimum needs have been verified by the certifying technical and requirements personnel.

Awarded contract N0002426C4403 to unknown vendor for unknown amount on 2025-11-10.

Files

File Type Posted
JA Fuel Oil Purifier Overhaul REDACTED.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors