Formosa Mine Remedial Action Capping Project

Closed Pre-Solicitation Posted

Solicitation number
W912DW25R0008_SS3
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
562910 Remediation Services
Place of performance
Riddle, Oregon, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The US Army Corps of Engineers (USACE), Seattle District, is seeking interested businesses for the Formosa Mine Remedial Action Capping Project located in Riddle, Oregon. The project involves implementing earthwork-related requirements for the EPA's Record of Decision at the Formosa Mine Superfund Site, focusing on removing, consolidating, and restricting contaminant source materials to minimize interaction with precipitation, surface water, and groundwater. Key project objectives include stabilizing steep slopes, constructing impermeable covers, grading and consolidating mine materials, and reconstructing roads within the project area. Interested firms must submit a ten-page capabilities package by June 20, 2025, at 2:00 PM PDT, detailing their experience, business classification, and past projects in construction and remediation. The evaluation will assess contractors' ability to perform the work, with a particular focus on demonstrating capabilities in similar large-scale environmental remediation projects.

The contract is estimated to be valued between $25 million and $100 million and will be a firm fixed-price procurement predominantly focused on construction (at least 51%). No specific set-aside has been determined, but businesses of all sizes are encouraged to respond, with the NAICS code 562910 for Remediation Services applying a small business size standard of $25 million in average annual receipts. The project will require 100 percent payment and performance bonds, and all interested firms must be registered in SAM (System for Award Management). The scope includes complex environmental remediation activities such as stabilizing slopes with gabion walls, developing borrow areas, constructing impermeable covers, grading and revegetating mine materials, and road reconstruction. Contractors will need to demonstrate significant experience in large-scale environmental remediation projects completed within the last six years.

Notice text

Sources Sought No: W912DW25R008_SS3

Subject: Formosa Mine Remedial Action Capping Project

UPDATED: NAICS Code: 562910 Remediation Services

UPDATED: PSC: Z1QA Maintenance of Restoration of Real Property (Public or Private)

UPDATED: Size Standard: $25.0 Million

Type of Set-Aside: Undetermined

UPDATED: Issue date: 6/6/2025

UPDATED: Closing Date: 6/20/2025 at 2 PM PDT

THIS IS A 3rd SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME.

The US Army Corps of Engineers (USACE), Seattle District, is seeking interested business sources for a project titled: “Formosa Mine Remedial Action Capping Project at Riddle, OR.”

The proposed project will be firm fixed-price and is predominantly construction (at least 51%). The magnitude is estimated to be in the range of $25,000,000 and $100,000,000. 100 percent payment and performance bonds will be required.

The North American Industry Classification System (NAICS) code for this project is 562910 Remediation Services, and the associated small business size standard is $25,000,000 in average annual receipts.

This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work and is for information/market research purposes only.

THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The type of solicitation to be issued will depend upon information received in response to this sources sought announcement. No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow up information. Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions.

NO SOLICITATION IS CURRENTLY AVAILABLE. This is not a request to be placed on a solicitation mailing list and is not to be construed as a commitment by the Government.

SUMMARY DESCRIPTION OF PROPOSED PROJECT (UNCHANGED):

The Formosa Mine Superfund site is an abandoned mine located in southwest Oregon in Douglas County. Locally, it is situated in the Coast Range Klamath Mountains at elevations between 3,200 and 3,700 feet (ft) above mean sea level (amsl) on Silver Butte Peak (3,973 ft amsl).

The project scope of work consists of activities necessary to implement primarily the earthwork-related requirements of the EPA’s Record of Decision for the Formosa Mine Superfund Site Operable Unit (OU) 1. OU1 includes all surface and subsurface mine materials deposited outside of the underground mine workings and considered "source materials" for the Site. These include materials excavated during construction and operation of the mine such as waste rock, ore, tailings, construction rock, road surfaces, and contaminated soils. The objectives of the OU1 remedial action are to remove, consolidate, and restrict or minimize the interaction of contaminant source materials with precipitation, surface water runoff, and groundwater. The remedial approach focuses on preventing direct exposure to mine waste with elevated concentrations of metals and reducing acid rock drainage (ARD) generation, thus, reducing impacts to groundwater and surface water. The remedial action includes OU1 mine materials at the encapsulation mound (EM); former ore storage/million-gallon storage tank area; the Formosa Adit 2, Formosa Adit 3, and 1090 Raise waste rock dumps (WRDs); and roads containing mine materials adjacent to these areas.

The specific project scope of work includes the following actions:

  • Stabilizing the steep encapsulation mound (EM) slopes with gabion walls;
  • development of a clean materials borrow area and non-primary mine disturbance area (PDMA) mine material repository;
  • grading and consolidation of mine materials in the non-PMDA mine material repository;
  • impermeable cover construction on the EM, former ore storage/million-gallon storage tank, and non-PMDA mine material repository;
  • grading, amendment and revegetation of mine materials at the area southwest of the EM, and Formosa Adit 2, Formosa Adit 3, and 1090 Raise waste rock dumps (WRD)s; and
  • excavation of mine materials from roads, reconstruction of roads within the project limits, and construction of a steep slope northwest (NW) access road for gabion wall placement.

SUBMITTAL REQUIREMENTS (UNCHANGED):

Interested firms should submit a capabilities package limited to ten (10) pages (Exclude Joint Venture and Bonding information from page count) and include the following:

1.  Firm’s name, address (mailing and URL), point of contact, phone number and email address.

2.  Business classification, i.e., Small Business (SB), Small Disadvantage Business (SDB), Woman-Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone (HUBZone) Small Business, 8(a) Program, or Other Than Small Business (Large Business).

3.  A maximum of three (3) examples of past projects as the Prime Contractor. Contractor must provide a brief description of experience in performing similar projects for Construction and Remediation of similar size, complexity and scope completed within the last six years. Examples should include the following information:

a.  A description of the project features, customer name, timeliness of performance, size of project, and dollar value of each project.

b.  Explanation as to how the work performed on each example project relates to the scope of work for Formosa Mine.

4.  Of the total summary Description of Proposed Project:

a.  Do you believe all aspects of the project could be performed by the small business sector?    Yes      No

b.  As a  large business /  small business, what estimated percentage of the TOTAL project would you self-perform?   ____%

c.  Please specify/describe which areas are best suited for subcontracting to the small business sector. Also identify your intentions to  team or  subcontract any work.

d.  What do you think can be subcontracted out to small business?

 Small Business (SB) ____%

 Small Disadvantage Business (SDB) ____%

 Woman-Owned SB (WOSB) ____%

 Veteran-Owned SB (VOSB) ____%

 Service-Disabled VOSB (SDVOSB) ____%

 Historically Underutilized Business Zone (HUBZone) ____%

e.  CAGE code Unique Entity ID number and NAICS Code(s) of your firm.

f.  Firm’s Joint Venture Information, if applicable.

g.  Bonding Information:

h.  Provide the following, on the Bonding Company’s letterhead:

  • Bonding Limits: (a) Single Bond (b) Aggregate

Responses to this Synopsis will be shared with the Government project team, but otherwise will be held in strict confidence.

Note: The official Synopsis citing a solicitation number will ONLY be issued on SAM.gov (100% free Official U.S. Government Website) inviting firms to register electronically to receive an electronic notification of a solicitation should one be issued.

PLEASE SUBMIT TO:

UPDATED: Responses to the Sources Sought Announcement should be received no later than 2:00 pm (Pacific Daylight Time) on 20 June 2025. Submit responses to the attention of Russ Armstrong, Contract Specialist at russell.j.armstrong@usace.army.mil.

USACE Seattle District Office of Small Business Programs POC: enshane.nomoto@usace.army.mil or 206-316-3990.

All interested firms must be registered in SAM (https://www.sam.gov) and remain current for the duration of the contract to be eligible for award of Government contracts.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Region 7 Southeast Mines Superfund Site NAICS 562910 ENDIST St Louis No set-aside
Geotechnical architecture and engineer services in NAICS 541330 — No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site One mile north of the town of Creede in Mineral County, Colorado 81130 · NAICS 237990 ENDIST Omaha No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity