Forest Service Lab Roof Replacement Project
Closed Solicitation Posted
- Solicitation number
- 1263PX20R0004
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- Place of performance
- Delaware OH 43015 USA
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
08/27/2020: The contract is being awarded to 12 Bravo Group in the amount of $239,936.00.
8/14/2020: 001 - The 59 wing construction has unforeseen complications to completing the re-roof construction. Therefore, that part of the project is remove it from consideration. The TPO and EPDM alternatives for the causeway and the 68 wing roofs remain as per the SOW.
Clarification: On the issue regarding reusing the insulation on the 68 wing. The government indicated in the SOW that this was a partial tear-off roof, meaning that some of the insulation may remain – as long as the remaining insulation is in acceptable condition. Refer the SOW references of the International Building Code and the National Roofing Contractors Association standards of practice. Amendment 001 Attached
Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows:
1. Remove and dispose of Single-Ply roofing membrane.
2. Remove identified rooftop equipment, curbs, and penetrations; infill roof deck openings.
3. Full or partial tear-off of existing roofing system as directed.
5. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim.
6. Add to, or replace as necessary, fascia sheet metal; maintain existing profile.
7. Repair or replace damaged expansion joints.
8. Install retrofit roof drains.
9. Install new or additional roofing insulation as directed.
10. Provide tapered roofing insulation as necessary to achieve proper roof drainage.
11. Install new fully adhered Single-Ply roofing system, flashing, and manufacturer’s roof penetration devices.
12. Incorporate mechanical equipment, curbs to remain, and penetrations into the new roofing system. Follow roofing system manufacturer’s flashing recommendations.
Update #2 ·
8/14/2020: 001 - The 59 wing construction has unforeseen complications to completing the re-roof construction. Therefore, that part of the project is remove it from consideration. The TPO and EPDM alternatives for the causeway and the 68 wing roofs remain as per the SOW.
Clarification: On the issue regarding reusing the insulation on the 68 wing. The government indicated in the SOW that this was a partial tear-off roof, meaning that some of the insulation may remain – as long as the remaining insulation is in acceptable condition. Refer the SOW references of the International Building Code and the National Roofing Contractors Association standards of practice. Amendment 001 Attached
Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows:
1. Remove and dispose of Single-Ply roofing membrane.
2. Remove identified rooftop equipment, curbs, and penetrations; infill roof deck openings.
3. Full or partial tear-off of existing roofing system as directed.
5. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim.
6. Add to, or replace as necessary, fascia sheet metal; maintain existing profile.
7. Repair or replace damaged expansion joints.
8. Install retrofit roof drains.
9. Install new or additional roofing insulation as directed.
10. Provide tapered roofing insulation as necessary to achieve proper roof drainage.
11. Install new fully adhered Single-Ply roofing system, flashing, and manufacturer’s roof penetration devices.
12. Incorporate mechanical equipment, curbs to remain, and penetrations into the new roofing system. Follow roofing system manufacturer’s flashing recommendations.
Update #1 ·
Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery, and all necessary valid licenses for the work summarized as follows:
1. Remove and dispose of Single-Ply roofing membrane.
2. Remove identified rooftop equipment, curbs, and penetrations; infill roof deck openings.
3. Full or partial tear-off of existing roofing system as directed.
5. Install additional wood blocking as necessary to accommodate additional roofing insulation and to support sheet metal flashing and trim.
6. Add to, or replace as necessary, fascia sheet metal; maintain existing profile.
7. Repair or replace damaged expansion joints.
8. Install retrofit roof drains.
9. Install new or additional roofing insulation as directed.
10. Provide tapered roofing insulation as necessary to achieve proper roof drainage.
11. Install new fully adhered Single-Ply roofing system, flashing, and manufacturer’s roof penetration devices.
12. Incorporate mechanical equipment, curbs to remain, and penetrations into the new roofing system. Follow roofing system manufacturer’s flashing recommendations.
Attachments
| File | Type | Posted |
|---|---|---|
| SF30-Delaware Roof.pdf | ||
| X-01 ARCH D.pdf | ||
| SF-1442 Solicitation Delaware Roof.pdf | ||
| X-02 ARCH D.pdf | ||
| X-03 ARCH D.pdf | ||
| Section M - Delaware Roof.pdf | ||
| Section C - Delaware Roof Replacement Project.pdf | ||
| Wage Rates-Delaware.pdf | ||
| SectionB-Delaware Roof.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity