FOM Follow-on RFI

Closed Pre-Solicitation Posted

Solicitation number
11950
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record
Place of performance
Utah 84056, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Air Force Sustainment Center has issued a Request for Information (RFI) for the Facilitate Other Maintenance (FOM) Follow-on requirement, seeking potential contractors who can provide staffing for aircraft storage and maintenance operations. The procurement involves managing and maintaining FOM parts and materials for multiple aircraft types including C-130, F-16, F-35, A-10, F-22, and T-38 aircraft at Hill Air Force Base, Utah, and Joint Base San Antonio/Randolph Air Force Base, Texas. Key requirements include receiving, issuing, inventorying, and controlling aircraft parts and materials in preparation for storage, with contractor personnel needing to track parts using specific AMXG forms, verify asset serviceability, and maintain precise inventory records. Personnel working on F-35 and F-22 programs specifically require security clearances, including secret clearance capabilities. The RFI responses are due by noon Mountain Standard Time on Wednesday, September 17, 2025, and must be submitted directly to Shelly Bachison and William Lee at their respective Air Force email addresses. This pre-solicitation inquiry seeks to determine potential vendor capabilities for staffing, with respondents asked to indicate whether they can provide the required staffing or explain any limitations preventing them from meeting the requirements.

This opportunity does not utilize any set-aside designations and is open to all qualified contractors. No current incumbents or contractors are specifically identified in the documentation provided. While no specific award values or budget ranges are disclosed in the RFI, the Performance Work Statement indicates significant workload variation across aircraft types with estimated asset removal and assembly days ranging from 20 to 140 days depending on the aircraft model. The staffing requirements vary by shift and aircraft type, with specifications calling for one dock, one building, one day per year, and one shift for each aircraft type listed. The contract will require managing a workforce capable of handling both surge capacity and historical workload demands. Historical workload data suggests substantial operational scope across the six different aircraft platforms, indicating this could be a sizeable procurement opportunity for qualified maintenance and logistics contractors.

Notice text

A request for proposal for the FOM Follow-on requriement.  If attached information was provided to you, would you be able to provide a proposal identifying staffing needs.

Files

File Type Posted
FOM RFI 9122025.docx DOCX document
11950_FOM PWS Draft for RFI.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Depot Maintenance Applications Consolidated 3 Dayton, Ohio 45420, United States · NAICS 541511 AFLCMC Wright Patterson AFB Competitive 8(a)
Aircraft Maintenance Fixture for KC-135 Spoiler Actuator Warner Robins, Georgia 31098, United States · NAICS 488190 Air Force Sustainment Center No set-aside
F138-100 engine sustainment Tinker AFB, Oklahoma 73145, United States · NAICS 336412 AFLCMC Tinker AFB No set-aside
Reliability and maintainability (r&m) engineering support for helicopter United States · NAICS 541330 AFLCMC Robins AFB Competitive 8(a)
LARICM Field Service Representative Wright Patterson AFB, Ohio, United States · NAICS 334419 AFLCMC Wright Patterson AFB No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity