Folsom Dam Raise Dikes 1 - 6

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123823B0004
Agency
ENDIST Sacramento US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1LC Construction Of Tunnels And Subsurface Structures
More information

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District Sacramento issued Solicitation Number W9123823B0004 seeking offers to raise Dikes 1 through 6 at Folsom Dam. Work includes raising Dikes 1, 4, 5 and 6 by constructing floodwalls along 6,841 feet of crest. A new embankment dike, Dike 3, will be built 80 feet upstream of the existing dike along a 1,614 foot crest. Dike 2 will receive a 3.5 foot toe-to-crest raise along its 1,765 foot crest. Riprap will be placed on the upstream side of all dikes. Offers are due by April 13, 2023 and will be evaluated based on price.

There is no set-aside designated for this procurement. The magnitude of construction costs is estimated between $25-100 million. Six offers were received in response, ranging from $26,963,537 to $71,246,569, with the government estimate being $34,631,798. Work will be performed along Dikes 1-6 at Folsom Dam in California.

Notice text

6 versions

Update #6 · Latest ·

Bid Abstract uploaded.

***Amendment 0004 has been posted*** Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Update #5 ·

***Amendment 0004 has been posted*** Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Update #4 ·

***Amendment 0002 has been posted***Amendment 0001 has been posted. Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Update #3 ·

***Amendment 0001 has been posted***Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Update #2 ·

Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Sign-in sheet from site visit on March 10, 2023 added below.

Update #1 ·

Folsom Dam Raise of Dikes 1-6 Work consists of raising Dikes 1, 4, 5 and 6, 3.5 feet by constructing a floodwall structure along a combined 6,841 feet of crest. A new embankment dike, Dike 3 with a crest length of 1614 feet, will be constructed 80 feet upstream of the existing dike. Dike 2, with a crest length of 1765 feet, will be a 3.5 feet toe-to-crest raise. Riprap will be placed on the upstream side of all the dikes. Magnitude of Construction is between $25,000,000 and $100,000,000. Competition is Unrestricted.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Abstract for W9123823B0004 - Folsom Dam Raise Dikes 1-6.pdf PDF
Sign In Sheet for Dikes 1-6 at FDR 10MAR23 (Contractor Site Walk).pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Folsom Dam Raise Dikes 1 - 6 Award Award Notice
Folsom Dam Raise Dikes 1 - 6 This notice · Latest solicitation Solicitation
Folsom Dam Raise of Dikes 1-6 Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity