Flood Protection Project Rehabilitation, Saw Mill Run, Allegheny County, PA
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN25B8005
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Pittsburgh District, is seeking a contractor for the Flood Protection Project Rehabilitation at Saw Mill Run in Allegheny County, Pennsylvania. The project involves rehabilitation work in two specific areas: a downstream area spanning approximately 780 feet near Violet Way and Neptune Street, and an upstream area of about 460 feet near Wabash Street and Greentree Road. The scope includes repairing revetment mat damages, addressing channel scour holes, and fixing access ramp damages, with some work to be covered by federal funds and some by sponsor deferred maintenance. The solicitation is structured as a competitive procurement with a due date of January 14, 2025, and requires careful review of the specific station (STA) locations and associated repair requirements. Potential bidders should closely examine the detailed project specifications and coordinate with the City of Pittsburgh, which is planning concurrent maintenance work in the project areas.
The contract is set aside for total small business participation and falls under the NAICS category 237990 for Other Heavy and Civil Engineering Construction. While specific award values were not explicitly stated in the solicitation, the project involves precise civil engineering rehabilitation work across two distinct areas of the Saw Mill Run channel. The place of performance is located in the City of Pittsburgh, Allegheny County, Pennsylvania, with work concentrated around specific channel segments near Violet Way, Neptune Street, Wabash Street, and Greentree Road. A site visit was conducted on December 18, 2024, which included representatives from potential contractors such as Cale Construction Company, Aspen Construction Co, and BRG Industries, Inc. The project appears to be part of a coordinated effort between the U.S. Army Corps of Engineers and the City of Pittsburgh to maintain and rehabilitate critical flood protection infrastructure.
Notice text
2 versions
Update #2 · Latest ·
PL84-99 Flood Protection Project Rehabilitation at Saw Mill Run, City of Pittsburgh, Allegheny County, for the U.S. Army Corps of Engineers, Pittsburgh District. There are two (2) specific work areas within the scope of this project and are noted as Downstream and Upstream Work Areas. Downstream Area: This work area is approximately 780 feet in length and spans the length of channel between the area near Violet Way and Neptune Street. The work area also includes the area near the Lincoln Highway bridge just above the channel access ramp location near the Artifacts Pittsburgh Store. Features of work that will be covered by Federal Funds for this project include the following: revetment mat damages (STA 23+52 - 23+86). Features of work that will be covered as Sponsor Deferred Maintenance include the following: revetment mat damages (STA 22+99 - 23+52), channel scour hole (STA 22+99 - 23+86). Upstream Area: This work area is approximately 460 feet in length and spans the length of channel at the upper portion of the project limits near the channel access ramp near the intersection of Wabash Street and Greentree Road. Features of work that will be covered by Federal Funds for this project include the following: revetment mat damages (STA 41+68 - 41+94), upper portions of access ramp damages near STA 41+94, revetment mat damages (STA 42+84 - 45+21), undercutting of existing revetment mat (STA 45+36 - 45+54). Features of work that will be covered as Sponsor Deferred Maintenance include the following: lower portions of access ramp damages near STA 41+94, scour hole near drop structure (STA 45+36 - 45+54), revetment mat damages (STA 45+21 - 45+36). An important note about project work at the overall Saw Mill Run Project. As of May 2021, the City of Pittsburgh is currently planning on completing deferred maintenance work in the project areas outside of these two (2) specific Rehabilitation Areas. This work will be completed by a maintenance contract by the City of Pittsburgh, likely ahead of this work under the PL 84-99 action. USACE and the City of Pittsburgh will continue to coordinate the project scope statements of each contract to ensure clarity of work to be completed by each contract. ***Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.***
Update #1 ·
PL84-99 Flood Protection Project Rehabilitation at Saw Mill Run, City of Pittsburgh, Allegheny County, for the U.S. Army Corps of Engineers, Pittsburgh District. There are two (2) specific work areas within the scope of this project and are noted as Downstream and Upstream Work Areas. Downstream Area: This work area is approximately 780 feet in length and spans the length of channel between the area near Violet Way and Neptune Street. The work area also includes the area near the Lincoln Highway bridge just above the channel access ramp location near the Artifacts Pittsburgh Store. Features of work that will be covered by Federal Funds for this project include the following: revetment mat damages (STA 23+52 - 23+86). Features of work that will be covered as Sponsor Deferred Maintenance include the following: revetment mat damages (STA 22+99 - 23+52), channel scour hole (STA 22+99 - 23+86). Upstream Area: This work area is approximately 460 feet in length and spans the length of channel at the upper portion of the project limits near the channel access ramp near the intersection of Wabash Street and Greentree Road. Features of work that will be covered by Federal Funds for this project include the following: revetment mat damages (STA 41+68 - 41+94), upper portions of access ramp damages near STA 41+94, revetment mat damages (STA 42+84 - 45+21), undercutting of existing revetment mat (STA 45+36 - 45+54). Features of work that will be covered as Sponsor Deferred Maintenance include the following: lower portions of access ramp damages near STA 41+94, scour hole near drop structure (STA 45+36 - 45+54), revetment mat damages (STA 45+21 - 45+36). An important note about project work at the overall Saw Mill Run Project. As of May 2021, the City of Pittsburgh is currently planning on completing deferred maintenance work in the project areas outside of these two (2) specific Rehabilitation Areas. This work will be completed by a maintenance contract by the City of Pittsburgh, likely ahead of this work under the PL 84-99 action. USACE and the City of Pittsburgh will continue to coordinate the project scope statements of each contract to ensure clarity of work to be completed by each contract. ***Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.***
Files
| File | Type | Posted |
|---|---|---|
| Sign-In Sheet - Bid Opening - W911WN25B8005.xlsx | XLSX spreadsheet | |
| W911WN25B8005 Site Visit Sign-In Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Flood Protection Project Rehabilitation, Saw Mill Run, Allegheny County, PA | Award Notice | |
| This notice | Solicitation | |
| Flood Protection Project Rehabilitation for Saw Mill Run, Pittsburgh, Pennsylvania, Allegheny County, PA. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Pittsburgh facility 079 MEP parking lot erosion control | ENDIST Philadelphia | No set-aside | |
| JP Murtha Float Mooring Bitts Retrofit | ENDIST Pittsburgh | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity