Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
FA8214-25S-FT3PD
Agency
Nuclear Weapons Center Air Force Materiel Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336419 Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
PSC
1427 Guided Missile Subsystems
Place of performance
United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Nuclear Weapons Center is conducting market research to identify potential sources for producing Flight Test, Telemetry and Termination (FT3) Flight Test Kits to support the Minuteman III Intercontinental Ballistic Missile (MMIII ICBM) Force Development Evaluation Operational Test Launch Program. These flight test kits must be compliant with specific Range Safety requirements and include four sub-kits: Integrated Instrumentation System, Electronic Safe and Arm Device, Electrical Cable Assembly Set, and Ordnance. The government is seeking qualified contractors who can demonstrate capabilities in producing a flight test kit that meets stringent technical specifications, with a focus on piece-parts program management, configuration control, systems engineering, and quality standards. Responses to this Sources Sought Synopsis must be submitted by February 24, 2025, at 4:00 pm Mountain Standard Time to the specified contact, Brad Vargo. The market research aims to determine if the procurement can be competitive or set aside for small businesses.

The government is interested in small businesses, including 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns, with the NAICS code 336419 having a size standard of 1,000 employees. While no specific award value is mentioned, the contract will support approximately four Operational Test Launches per year through 2040, with first scheduled launch on October 1, 2030. Contractors must be prepared to deliver flight test kits to four staging areas at Vandenberg Space Force Base, with just-in-time deliveries 120 days ahead of scheduled launch dates. The government emphasizes that it will own the technical baseline and associated data, and expects contractors to utilize standard Air Force and ICBM enterprise maintenance data collection systems. Importantly, the government will not incur costs for system development or qualification, and contractors must demonstrate the ability to deliver a fully qualified flight test kit without additional investment.

Notice text

REQUIREMENT TITLE:  Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production

NSN/Part Number: TBD still in development stage

Solicitation Number:  FA8214-25S-FT3PD

Notice Type:  Sources Sought Synopsis

  1. NOTICE:  This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only.

1.1 The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, to assist in determining if this effort can be competitive and/or a total Small Business Set-Aside.  The product service code is 14.  The proposed North American Industry Classification Systems (NAICS) Code is 336419 which has a corresponding Size standard of 1000.  The Government will use this information to determine the best acquisition strategy for this procurement.  The Government is interested in all small businesses to include 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns.  The government requests that interested parties respond to this notice if applicable and identify your small business status to the identified NAICS code.  Additionally, please provide any anticipated teaming arrangements, along with a description of similar services offered to the Government and to commercial customers for the past three years.  Any responses involving teaming agreements should delineate between the work that will be accomplished by the prime and the work accomplished by the teaming partners.

  1.  Details

This synopsis does NOT constitute a Request for Proposal (RFP), Request for Quotation, Invitation for Bid (IFB), nor does its issuance in any way restrict the Government as to its ultimate acquisition approach. The Government reserves the right to set aside any subsequent acquisition based upon known sources and/or responses to this synopsis.  The Government intends to establish a new contract for the production of FT3 flight test kits (replenishment spares) used to support the Air Force Global Strike Command (AFGSC) Minuteman III Intercontinental Ballistic Missile (MMIII ICBM) Force Development Evaluation (FDE) Operational Test Launch (OTL) Program.

  1.  Background

AFGSC conducts the ICBM Operational Test & Evaluation (OT&E) program in accordance with AFGSC Instruction 99-102, ICBM Operational Test and Evaluation.  The ICBM OT&E program provides accuracy and reliability planning factors to the Commander, United States Strategic Command, and evaluates the operational effectiveness and suitability of system modifications or upgrades prior to initial fielding.  The ICBM OT&E includes OTLs, which are flown from the Western Test Range (WTR) located at Vandenberg Space Force Base (VSFB), California, and conducted by the 576th Flight Test Squadron.  The OTLs, designated GLORY TRIPs, consist of flight tests of operational ICBMs in a peacetime environment in as near to the operational flight environment as possible from first stage ignition to impact. When flying on the WTR, the operational missiles must be equipped for range tracking, missile telemetry, and flight termination. The flight test kit integrates these capabilities into one complete system. AFGSC is planning to conduct approximately four OTLs per year through the life of the MMIII ICBM Weapon System (~2040).

All flight test kits must be compliant with Range Safety requirements:  Range Commander’s Council (RCC) 319-14(T), Flight Termination Systems Commonality Standard; RCC 324-11(T), Global Positioning and Inertial Measurements Range Safety Tracking Systems’ Commonality Standard; RCC 313-01(T), Test Standards for Flight Termination Receivers/Decoder; andAFSPCMAN 91-710 (T), Range Safety User Requirements Manual Volume 1 - Air Force Space

Command Range Safety Policies and Procedures.   

  1.  CONTRACTOR CAPABILITIES

Subject to the Government’s consideration, a viable source, not already qualified to provide the requisite product and services should submit a concise and program specific response, presenting sufficient information to substantiate they have demonstrated the capability for the following:

  1. A flight test kit qualified to the above-mentioned requirements and product specifications (available upon request) for delivery in time for first scheduled launch, 1 October 2030. The Government will not incur costs for any necessary development or qualification of the system. 
  2. FT3 flight test kit deliveries must support AFGSC’s 5-year flight test schedule with just-in-time deliveries 120 days ahead of scheduled launch dates. It is anticipated this schedule will continue for the life of MMIII.
  3. Delivery of the flight test kit consisting of four sub-kits, (1) Integrated Instrumentation System (IIS), (2) Electronic Safe and Arm Device (ESAD) for downstage install, (3) Electrical Cable Assembly Set, and the (4) Ordnance to be shipped to four staging areas at VSFB, and conduct acceptance test procedures.
  4. Strict scrutiny and emphasis will be placed on the contractor’s piece-parts program, configuration management process, systems engineering process, and quality standards to include its subcontractors.  Specifically, a parts program (5,000+ piece-parts) will avoid parts obsolescence issues, demonstrate how quantities of parts are purchased and how lots are controlled, part screening to detect any electrical or mechanical workmanship defects and infant mortality failure modes, and will accomplish functional testing at the piece-parts and/or subsystem level.
  5. Maintain that the Government will own the technical baseline and all associated data.
  6. Use of contractor logistics support.
  7. Use of standard AF and ICBM enterprise maintenance data collection systems, databases and processes when necessary.
  1.  ADDITIONAL INFORMATION

This Sources Sought Synopsis is not a request for proposals.  The Air Force will not pay for either the effort or the associated costs to respond, or for any information provided.    

A determination by the Government not to compete this proposed contract will be based upon responses to this Sources Sought Synopsis and the information received. This information will be considered solely for the purpose of determining whether to conduct a competitive procurement.    

Responses must be received by February 24, 2025, 4:00 pm Mountain Standard time to AFNWC/PZBB, ATTN: Brad Vargo, 6008 Wardleigh Road, Bldg 1580, Hill AFB, Utah, 84056 or bradley.vargo.1@us.af.mil.  No phone or FAX requests will be accepted.

If required, contact contracting officer listed below for additional information.

Points of Contact:

Brad Vargo, Contracting Officer.  Phone: 801-775-3700, bradley.vargo.1@us.af.mil

Dennis Pulsipher, Program Manager, Phone: 801-775-2007, dennis.pulsipher@us.af.mil

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production Latest solicitation Solicitation
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production Pre-Solicitation
Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity