Fimi PL 84-99 FY23

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912DS23S0017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Babylon, New York 11702, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Army Corps of Engineers, New York District is seeking information from contractors interested in a contract for emergency stabilization work along the Fire Island barrier island in Suffolk County, New York. The work includes placing approximately 800,000 cubic yards of beachfill with a dune at elevation +14-ft NAVD88 and berm at elevation +8.5-ft NAVD88, as well as additional dredging work placing approximately 500,000 cubic yards of beach fill along the Montauk Beach shoreline. Responses from interested contractors to the sources sought notice are due no later than February 10, 2023.

There is no set-aside designation for this procurement. The contract value is estimated to be over $25 million and notice to proceed is anticipated for June 2023. The work must be completed ready for use before March 2024, including final cleanup of the premises. An additional 260 calendar days from notice to proceed is allocated for the dredging work in Downtown Montauk.

Notice text

* See Attachment for Complete Sources Sought Notice

The Federally authorized Fire Island Inlet to Moriches Inlet Emergency Stabilization Project (FIMI) is situated on the Fire Island barrier island in Suffolk County, New York. There have been 4 construction contracts to date for the FIMI Project, which have been completed and turned over to the sponsor. A portion of the project consisting of a dune and berm, completed and turned-over to the sponsor in 2017 and 2018 was impacted by storms. The storms caused significant coastal damage along this portion of the project, and this emergency stabilization project is the proposed rehabilitation effort under P.L 84-99.

The current condition is approximately as vulnerable as the pre-project (Post-Sandy, 2012) condition. Without repair to the project, there is an extremely high threat of damage to barrier island infrastructure, and a high potential for barrier island breaching and the damages associated with a breach.

Work will include approximately 800,000 cubic yards of beachfill with a dune at elevation +14-ft NAVD88 and berm at elevation +8.5-ft NAVD88. A hopper dredge will be used to dredge sand from an existing offshore Atlantic Ocean Borrow Area. Complete the entire work ready for use, before March 2024, including final cleanup of the premises. Additional dredging work includes approximately 500,000 cubic yards of beach fill along the Montauk Beach shoreline. A berm will be constructed at a maximum crest elevation of +8.5-ft NAVD88 and a dune will be placed with an elevation height of +12-ft NAVD88. Additional time will be awarded for the Downtown Montauk work.

The contract value is estimated to be over $25,000,000. Notice to Proceed is anticipated June 2023.  Estimated project duration is 260 calendars days from NTP.

Files

File Type Posted
FIMI PL 84 99 - Sources Sought.pdf PDF

Notice history

Notice Type Posted
Fimi PL 84-99 FY23 Award Award Notice
Fimi PL 84-99 FY23 Latest solicitation Solicitation
Fimi PL 84-99 FY23 Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Tybee Island Shoreline Protection Project Tybee Island, Chatham County, Georgia. Tybee Island, Georgia 31328, United States · NAICS 237990 ENDIST Savannah No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors