Fimi PL 84-99 FY23
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912DS23S0017
- Agency
- ENDIST New York US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Babylon, New York 11702, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Army Corps of Engineers, New York District is seeking information from contractors interested in a contract for emergency stabilization work along the Fire Island barrier island in Suffolk County, New York. The work includes placing approximately 800,000 cubic yards of beachfill with a dune at elevation +14-ft NAVD88 and berm at elevation +8.5-ft NAVD88, as well as additional dredging work placing approximately 500,000 cubic yards of beach fill along the Montauk Beach shoreline. Responses from interested contractors to the sources sought notice are due no later than February 10, 2023.
There is no set-aside designation for this procurement. The contract value is estimated to be over $25 million and notice to proceed is anticipated for June 2023. The work must be completed ready for use before March 2024, including final cleanup of the premises. An additional 260 calendar days from notice to proceed is allocated for the dredging work in Downtown Montauk.
Notice text
* See Attachment for Complete Sources Sought Notice
The Federally authorized Fire Island Inlet to Moriches Inlet Emergency Stabilization Project (FIMI) is situated on the Fire Island barrier island in Suffolk County, New York. There have been 4 construction contracts to date for the FIMI Project, which have been completed and turned over to the sponsor. A portion of the project consisting of a dune and berm, completed and turned-over to the sponsor in 2017 and 2018 was impacted by storms. The storms caused significant coastal damage along this portion of the project, and this emergency stabilization project is the proposed rehabilitation effort under P.L 84-99.
The current condition is approximately as vulnerable as the pre-project (Post-Sandy, 2012) condition. Without repair to the project, there is an extremely high threat of damage to barrier island infrastructure, and a high potential for barrier island breaching and the damages associated with a breach.
Work will include approximately 800,000 cubic yards of beachfill with a dune at elevation +14-ft NAVD88 and berm at elevation +8.5-ft NAVD88. A hopper dredge will be used to dredge sand from an existing offshore Atlantic Ocean Borrow Area. Complete the entire work ready for use, before March 2024, including final cleanup of the premises. Additional dredging work includes approximately 500,000 cubic yards of beach fill along the Montauk Beach shoreline. A berm will be constructed at a maximum crest elevation of +8.5-ft NAVD88 and a dune will be placed with an elevation height of +12-ft NAVD88. Additional time will be awarded for the Downtown Montauk work.
The contract value is estimated to be over $25,000,000. Notice to Proceed is anticipated June 2023. Estimated project duration is 260 calendars days from NTP.
Attachments
| File | Type | Posted |
|---|---|---|
| FIMI PL 84 99 - Sources Sought.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fimi PL 84-99 FY23 | Award Notice | |
| Fimi PL 84-99 FY23 | Solicitation | |
| Fimi PL 84-99 FY23 | Pre-Solicitation | |
| Fimi PL 84-99 FY23 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity