FCI ESTILL - Asphalt Supply & Coordinated Delivery
Closed Pre-Solicitation Posted
- Solicitation number
- 15B30526PR000069
- Agency
-
BOP Field Acquisition Office
Regional Offices, Department of Justice
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 324121 Asphalt Paving Mixture and Block Manufacturing
- PSC
- 5610 Mineral Construction Materials, Bulk
- Place of performance
- Estill, South Carolina 29918, United States
- Points of contact
-
- Anne Bradley abradley1@bop.gov (771) 474-6749
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Bureau of Prisons Field Acquisition Office intends to solicit a single commercial vendor to supply and coordinate delivery of asphalt materials and logistics support for a large-scale internal paving project at FCI Estill, South Carolina, with a sources-sought response deadline of August 11, 2026. This is a firm-fixed-price procurement under FAR Parts 12 and 15; no set-aside applies.
The vendor must supply approximately 10,000 tons of SCDOT-compliant Surface Type C RAP hot batch asphalt (arriving at 270°F to 325°F) and 14,000 gallons of AASHTO MP 36-18 certified tack coat emulsion to support an FBOP-supervised inmate labor crew resurfacing 732,528 square feet of roadway and surface area. The vendor must maintain a dedicated fleet of tandem, tri-axle, and quad-axle dump trucks capable of delivering 1,000 to 1,500 tons per day over seven consecutive days, provide a certified tanker spray truck and operator to apply tack coat at approximately 100,000 square feet per day, and deploy a fulltime onsite Logistics Coordinator/Quality Control Specialist to manage truck pacing, load inspection, and real-time coordination with the FBOP project monitor. Work is performed at FCI Estill and is constrained to institutional hours of 6:30 AM to 6:30 PM.
The vendor retains full financial risk and responsibility for all materials until acceptance at the facility. All personnel must comply with strict federal prison security procedures, including vehicle searches, restricted attire, no mobile devices, and gate delays without claiming additional fees. Any loads arriving outside temperature thresholds or cooling below 175°F are rejected at vendor expense. The project timeline is 15 days to completion, though vendors may propose alternative schedules. Prospective vendors should indicate their capability, proposed subcontracting levels, proposal preparation timeline, mobilization capability following security clearance investigation (approximately 21 days), and firm details including name, address, UEI, point of contact, telephone, and email to abradley1@bop.gov.
Notice text
The Federal Bureau of Prisons, FCI Estill, is conducting a large-scale internal asphalt paving project covering 732,528 square feet of roadway and surface area. The work will be physically performed by an FBOP‑supervised inmate labor crew, while a single commercial vendor is required to provide all materials, delivery logistics, and on‑site coordination needed to support the operation.
The vendor must supply approximately 10,000 tons of SCDOT‑compliant hot batch asphalt and 14,000 gallons of AASHTO‑certified tack coat emulsion, along with a fully coordinated fleet of tandem/tri/quad‑axle dump trucks capable of delivering 1,000 to 1,500 tons per day over a 7‑day delivery window. All materials must arrive within required temperature thresholds; any non‑compliant loads are rejected at the vendor’s expense.
In addition, the vendor must provide a certified tanker spray truck and operator to apply tack coat ahead of the paving crew, and must maintain a qualified on‑site logistics coordinator/quality control specialist to synchronize truck arrivals, inspect loads, manage pacing, and ensure continuous communication with the FBOP project monitor.
The project requires strict adherence to institutional security procedures, weather limitations, FAR clauses governing delays and stop‑work events, and defined operational hours (6:30 AM–6:30 PM). Quantities listed are estimates and may vary; the government pays only for accepted materials. The vendor retains full responsibility and risk for all supplies until accepted inside the facility.
Files
| File | Type | Posted |
|---|---|---|
| FCI Estill - Market Research Questionnaire.docx | DOCX document | |
| FCI EST Asphalt and Delivery Coordination_SOW.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 26Z1AY6_Replace Roofing_FCC Butner | BOP Field Acquisition Office | No set-aside | |
| Asphalt Repair at Carl Sandburg Historic Site | Interior Business Center | Total Small Business |