Fault monitor assem / 40A / UH-60 series
Closed Pre-Solicitation Posted
- Solicitation number
- SPE4A725R0185
- Agency
-
Aviation
Defense Logistics Agency, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- Not on record
- Place of performance
- Richmond, Virginia 23297, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Defense Logistics Agency Aviation is seeking to procure fault monitor assemblies for the UH-60 series of aircraft. The assemblies must be manufactured in accordance with the provided technical data and will be evaluated based on the ability to meet the requirements. Key dates include a January 10, 2025 due date for responses, a 300-day timeline for first article testing, and a 210-day timeline for delivery of production units after government approval. This procurement will be issued as a 100% small business set-aside, with an estimated annual quantity of 48 units and an indefinite quantity contract for a base period of 5 years with no options. Contractors must be certified to access the unclassified technical data required for this item, and a first article test report will be required prior to production.
Notice text
RESPONSES DUE: 01/10/2025
FAULT MONITOR ASSEM / 40A / UH-60 SERIES
NSN: 1680-012210482, IQC PR: 1000194924, ITEM: FAULT MONITOR ASSEM
PARTS SHALL BE MANUFACTURED IN ACCORDANCE WITH:
IAW BASIC DRAWING NR 78286 70902-01110
REVISION NR M DTD 02/15/1993
PART PIECE NUMBER: 70902-01110-044
THE SOLICITATION WILL BE ISSUED AS A 100% SMALL BUSINESS SET-ASIDE
(FULL AND OPEN COMPETITION AFTER THE EXCLUSION OF SOURCES).
THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANTITY IS 48 EACH.
CONTRACTOR FIRST ARTICLE TESTING IS REQUIRED. DELIVERY OF THE FIRST ARTICLE TEST REPORT WILL BE 300 DAYS ARO. GOVERNMENT APPROVAL/DISAPPROVAL WILL BE 60 DAYS AFTER RECEIPT OF FIRST ARTICLE TEST REPORT. DELIVERY OF THE PRODUCTION UNITS WILL BE 210 DAYS AFTER GOVERNMENT APPROVAL. FOB IS AT DESTINATION. FIRST ARTICLE TERMS: INSPECTION AT ORIGIN, ACCEPTANCE AT DESTINATION. PRODUCTION UNIT TERMS: INSPECTION AND ACCEPTANCE AT ORIGIN.
THIS ITEM CITED REQUIRES DATA WHICH IS RESTRICTED TO CONTRACTORS CERTIFIED BY DOD TO ACCESS UNCLASSIFIED DATA PER DOD 5220.22M. CERTIFICATION IS OBTAINED BY SUBMITTING DD FORM 2345, MILITARY CRITICAL TECHNICAL DATA AGREEMENT, TO THE DEFENSE LOGISTICS INFORMATION SERVICES.
A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT “REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)” FROM THE MENU UNDER THE TAB “SOLICITATIONS.” THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR ABOUT DECEMBER 09, 2024.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Helicopter, blackhawk, UH-60A; fold set, rotary win | Aviation | Total Small Business | |
| Stabilizer bar damper assembly / 27F, HH-60 all variations pave hawk helicopter | Aviation | No set-aside | |
| “NSN 1680-01-553-0271, panel, fault-functio, wsdc: 40A, helicopter, blackhawk, UH-60A, UH-60L, HH/UH-60M, UH-60V. ” | Aviation | No set-aside | |
| Meter, Time Totalizing, [WSDC: 40A] End Item: Helicopter, UH-60A, UH-60L, UH-60V PR: 7016784839; NSN: 6645-013239411 IAW P/N: 999A0061 and P/N: 166125-100 | Aviation | No set-aside | |
| MMIII Support Assembly FR | Aviation | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity