Fabrication of Coffer Box For McClellan-Kerr Arkansas River Navigation
Closed Solicitation Posted
- Solicitation number
- W912BV21R0038
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- PSC
- E1KA Purchase Of Dams
- Place of performance
- Tulsa, Oklahoma, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks the fabrication of a coffer box for use on the McClellan-Kerr Arkansas River Navigation project. The selected contractor will be responsible for conducting field measurements of 10 locations, fabricating, painting, and delivering the coffer box. The contractor must also provide a representative to witness installation and pressure testing at a USACE Tulsa District facility within one year of delivery. The testing period is seven days. The contractor's representative must be a registered professional engineer to inspect components before and after testing. The contractor must provide digital documentation of all inspections to the Department of the Army Corps of Engineers Engineering District Tulsa, which issued this solicitation. Proposals are due in accordance with the solicitation schedule.
This total small business set-aside solicitation has a place of performance in Tulsa, Oklahoma. The NAICS code is 237990 and PSC code is W912. Fabrication will be completed and delivery made within one year, with testing to follow at the USACE Tulsa District facility. The solicitation does not provide an estimated value or budget range.
Notice text
The following is a summary of the major items of work included in this
Solicitation. All the items listed here are described in greater detail
throughout the rest of the technical sections. The work includes, but is
not limited to:
a. Conduct underwater field measurements of all (10) locations in
accordance with the contract specifications and plans.
b. Fabricate, paint, and deliver the coffer box as described.
c. Provide a contractor representative to witness installation and
pressure testing at a USACE Tulsa District facility. Contractor
representatives must have authority to speak on behave of the
Contractor. The installation and pressure test will occur within one
year of coffer box delivery date at a time and location determined by
USACE. Contractor will be given at least two weeks notice of the time
and location of test. Contractor representative must be a structural
or mechanical professional engineer registered within the United
States. The period of performance for the test will seven days. The
Contractor representative must inspect all structural and mechanical
components prior to installation and after removal. The Contractor
must provide digital copies of all inspection documentation to the
Government.
Files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - MKARNS Coffer Box Plans.pdf | ||
| Attachment 1 - MKARNS Coffer Box Specs.pdf | ||
| W912BV21R0038.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Fabrication of Coffer Box For McClellan-Kerr Arkansas River Navigation | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity