EMF Station Service Long Lead GFE
Award Notice Posted
- Solicitation number
- 89503324QWA000260
- Agency
-
Department of Energy
- Awarded
- to Kijero, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 89503324PWA000360 Federal contract award
- NAICS code
- 335313 Switchgear and Switchboard Apparatus Manufacturing
- PSC
- 5930 Switches
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
This Award Notice is for a contract awarded by the Department of Energy for the procurement of EMF Station Service Long Lead GFE. The contract was awarded to Kijero, LLC for $107,904.30 and includes 4 items: (1) an automatic transfer switch, (2) fusible safety switches, (3) a 3-way generator and load bank manual transfer switch, and (4) a main breaker with arc flash detection. The contract was awarded on September 24, 2024 with no set-aside.
Notice text
EMF Station Service Long Lead GFE. 4 total items: (1) Automatic transfer switch, 480V, 800A. (2) Fusible safety switches, 480V, 800-A. (3) 3-way generator and load bank manual transfer switch. (4) Main Breaker DWA, 480V, 800A with Arc Flash Detection.
Awarded contract 89503324PWA000360 to Kijero, LLC for 107904.3 on 2024-09-24.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| EMF Station Service ATS, 3-way generator, Main B | Solicitation | |
| Sources Sought- ATS Switches & Generator Equipment | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity