Embankment and Supporting Construction Activities

Awarded Award Notice Posted

Solicitation number
W912EQ-12-R-0009
Agency
ENDIST Memphis US Army Corps of Engineers, Department of Defense
Awarded
to Harold Coffey Construction Co Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912EQ-12-D-0006 Federal IDV award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: May 30, 2012 5:39 pm Modified: Jun 06, 2012 8:43 amTrack Changes Mississippi River Levee - Construction, Birds PointNew Madrid (BPNM) Upper Levee Restoration, Levee Drainage District No. 3 of Mississippi County, MO.

Update #3 ·

Added: May 30, 2012 5:39 pm Modified: May 30, 2012 5:53 pmTrack Changes Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.

Update #2 ·

Added: May 30, 2012 5:39 pm Modified: May 30, 2012 5:49 pmTrack Changes Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.

Update #1 ·

Added: May 30, 2012 5:39 pm Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Birds Point New Madrid Inflow/Outflow No. 1 (a. k. a. Middle Crevasse) Restoration, St. John's Levee & Drainage District of Mississippi County, MO Latest Award Notice
Embankment and Supporting Construction Activities This notice Award Notice
Birds Point New Madrid Levee Restoration, Inflow Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity