Embankment and Supporting Construction Activities
Award Notice Posted
- Solicitation number
- W912EQ-12-R-0009
- Agency
-
ENDIST Memphis
US Army Corps of Engineers, Department of Defense
- Awarded
- to Harold Coffey Construction Co Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912EQ-12-D-0006 Federal IDV award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- More information
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Mississippi River Levee - Construction, Birds PointNew Madrid (BPNM) Upper Levee Restoration, Levee Drainage District No. 3 of Mississippi County, MO.
Update #3 ·
Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.
Update #2 ·
Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.
Update #1 ·
Memphis District Corps of Engineers has awarded three (3) MATOCs. The work consists of a Multiple Award Task Order Contract (MATOC) for earthwork construction throughout the Memphis District; however, there is an emphasis that this contract will be used to reconstruct the upper, middle, and lower reaches of main line Mississippi River levee where it was crevassed in the spring of 2011 near Birds Point, New Madrid. Construction will consist of levee embankment construction/enlargement, berm embankment, culvert installation/replacement, pipe and access well installation, and maintenance of existing projects within the Memphis District. The work consists of furnishing all plant, labor, materials and equipment for the work to be performed. The work includes, but is not limited to: clearing, stripping; grubbing; borrow pit development and excavation, channel excavation, processing for moisture control, construction of embankment, compaction, stockpiling of material; debris disposal; placement of geo-textile, filter material, riprap, culvert installation, pipe and access well installation, gravel surfacing and establishment of turf/seeding and mulching. This project will be located at various locations within the Memphis District. The total contract ceiling is Not to Exceed $20,000,000.00 for all contracts.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Birds Point New Madrid Inflow/Outflow No. 1 (a. k. a. Middle Crevasse) Restoration, St. John's Levee & Drainage District of Mississippi County, MO | Award Notice | |
| This notice | Award Notice | |
| Birds Point New Madrid Levee Restoration, Inflow | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity