EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, Alaska
Closed Special Notice Posted
- Solicitation number
- W911KB27RA003
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236210 Industrial Building Construction
- Place of performance
- Eielson AFB, Alaska, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Alaska District, issued a Request for Information on August 18, 2026, with responses due by August 28, 2026, seeking market intelligence on construction of a new 3,515 square-meter Range Operations Center at Eielson Air Force Base, Alaska. This RFI is for informational purposes only and does not constitute a formal solicitation; participation is voluntary, the Government will not be obligated to award any contract based on this notice, and submission will not affect future proposal eligibility.
The facility will support the Alaska Red Flag mission and major combat training operations in a joint, multinational, multi-domain environment. The structure will be multi-story with a non-frost-susceptible foundation system, conventional shallow concrete foundation, steel framing, and seismic design featuring special concentrically braced frames. Exterior materials will comply with Eielson Air Force Base Installation Facility Standards, including metal siding panels and membrane roofing. Work scope includes administrative space, building support space, and secure workspace for mission-critical activities.
NAICS code 236210 (Industrial Building Construction) applies with a small business size standard of $45 million. PSC code Y1AZ covers construction of administrative facilities and service buildings. Interested contractors should submit capability information or market intelligence by August 28, 2026, to inform the Government's acquisition planning.
Notice text
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE
Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.
NAICS Code: 236210 – Industrial Building Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)
Small Business Size Standard: $45 Million
PROJECT OVERVIEW
The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for constructing a new 3,515 Squar Meter facility across Flight Line Avenue from Building 1151 in support of the Alaska Red Flag mission, including all air operations for major combat training in a joint, multinational, multi-domain, and unconventional environment against 21st-century near-peer competitors. The facility will include administrative space, building support space, and secure workspace for mission-critical activities. The facility shall be a multi-story structure with a non-frost-susceptible foundation system. Work includes, but is not limited to, the construction of a facility with a conventional shallow concrete foundation system, steel structure and framing, and seismic design with special concentrically braced frames. The building exterior will feature Eielson Air Force Base Installation Facility Standards-compliant metal siding panels and a compatible membrane low-slope roof system. Standing seam metal roofing shall be used where visible from the ground. The facility will be air-conditioned and supported by base-wide district utilities for steam, water/sewer, and electricity. Soils remediation is required to mitigate, transport, and dispose of hazardous soils off-site. Infrastructure and facility design should be compatible with applicable Department of Defense, Air Force, and base design standards. Work will include all subgrade and subbase work, drainage, foundation, and facility assembly. Additionally, local materials and construction techniques should be used where cost-effective. The facility will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01.
Estimated Acquisition Magnitude: $50,000,000 to $100,000,000
Planned Acquisition Strategy: Anticipated to utilize Construction Manager at Risk via Other Transaction Authority (OTA)
The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk (CMAR).
- Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project’s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR).
- Phase 2: Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods.
SUBMISSION INSTRUCTIONS: Please follow the link: https://forms.osi.apps.mil/r/0cGuS5MpFU to MS Forms and submit the questionnaire. The questionnaire will close for responses on 28 August 2026 at 12:00PM Alaska Time.
Any questions regarding the requirement or issues with MS Forms please reach out to Jason Linn at jason.linn@usace.army.mil and Michelle Nelsen at michelle.nelsen@usace.army.mil
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Special Notice | |
| EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, Alaska | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Market Intelligence for EIE483 and EIE484 | ENDIST Alaska | No set-aside | |
| Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility | Department of Defense | No set-aside | |
| (EAR048) Repair Fire Alarm System Eareckson Air Station Facilities | ENDIST Alaska | No set-aside | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| Request for information/sources sought | ENDIST Albuquerque | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity