Easton, ME Land Port of Entry (LPOE) Two Phase Design Build and Demolition

Award Notice Posted

Solicitation number
HSBP1010R0052
Agency
Awarded
to Sheri - Key
Set-aside
Total Small Business

Opportunity facts

Contract number
HSBP1010C00101 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Mene 12 Easton Easton, Maine 04413, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

A MODIFICATION HAS BEEN AWARDED TO THE SHERIDAN CORPORATION ON  4-20-11, IN THE AMOUNT OF A DEOBLIGATION TO THE CONTRACT OF ($636,325.00). THIS MODIFICATION IS AS A RESULT OF DESIGN CHANGES TO THE EASTON, ME LPOE PROJECT.

A MODIFICATION HAS BEEN AWARDED TO THE SHERIDAN CORPORATION ON 11-28-11, IN THE AMOUNT OF $41,261.53.  THIS MODIFICATION IS AS A RESULT OF ADDING EXTERIOR CABLE, MUX BOX AND CONSTRUCTION BOLLARDS AROUND THE BUILDING OF THE EASTON, ME LPOE. 

THE SECONDARY POINT OF CONTACT CHANGED FROM MR. TERRY SPITZMILLER TO MRS. APRIL L JENNINGS.

Update #5 ·

RECOVERY-PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY.  THIS OPPORTUNITY IS AVAILABLE ONLY UNDER THE CONTRACT #HSBP1010C00101.

A CONTRACTING MODIFICATION WILL BE NEGOTIATED WITH THE CONTRACTOR FOR SUSTAINABILITY REQUIREMENTS FOR THE LPOE IN EASTON, MAINE.

A MODIFICATION HAS BEEN AWARDED TO THE SHERIDAN CORPORATION ON   9-28-10, IN THE AMOUNT OF $222,445.00.  THIS MODIFICATION IS AS A RESULT OF SUSTAINABILITY CHANGES TO THE EASTON, ME LPOE PROJECT. 

Update #4 ·

This Award Notice is issued subject to the requirements of the American Recovery and Reinvestment Act (ARRA).  The procurement has been conducted in accordance with FAR Parts 15, 19.5 and 36 as a Two Phase Design Build, Total Small Business Set Aside Request For Proposal (RFP), HSBP1010R0052.  In accordance with FAR Subpart 36.3, two solicitations have been issued in sequence covering both phases.   

US Customs and Border Protection (CBP) hereby makes award to The Sheridan Corporation.

Treasury Accounting Symbol (TAS)= 709/00535 

Update #3 ·

Find Phase I Solicitation, HSBP1010R0052, Design/Build Easton, ME LPOE attached.


*The amended version of the FBO Notice dated 4-15-2010, reflects a clarification on the due date time of 3:00 PM, EST on 4-30-2010.  The solicitation has the correct date and time the proposal is due; therefore no changes are required to the RFP.

Update #2 ·

Find Phase I Solicitation, HSBP1010R0052, Design/Build Easton, ME LPOE attached.

Update #1 ·


This Notice is issued subject to the requirements of the American Recovery and Reinvestment Act (ARRA). The procurement will be a Two-Phase Design-Build and Demolition Request for Proposal (RFP), HSBP1010R0052. In accordance with FAR Subpart 36.3, two solicitations will be issued in sequence covering both phases. This notice is used to announce both the Phase One and Phase Two solicitations. No other pre-solicitation notice will be issued or provided. US Customs and Border Protection is soliciting for construction services with design, build, and demolition capability for a new Easton Land Port of Entry (LPOE) in Easton, ME. Plans and specifications with an approximate 35% design will be provided only with the Phase Two solicitation package and to those considered for the Phase Two portion of the competition.

In accordance with FAR Part 19.5, this procurement is planned to be totally set-aside for small business. Competitive proposals will be evaluated based on the evaluation criteria set forth in the Phase One solicitation package and subsequent Phase Two solicitation package. The prime Offeror shall possess a current NAICS of 236220 as of the required Phase One proposal submission date. The small business size standard of $33.5 million (average of a 3-year period) shall be used. The estimated cost range of this project is between $5 and $10 million. The prime Offeror shall be required to submit a letter from their bonding company indicating proof the Offeror has sufficient performance and payment bonding capacity to cover the highest estimated dollar amount of the project along with the Phase One proposal. The prime Offeror shall also be required to submit a bid guarantee with their Phase Two offer.


Phase One of the solicitation shall consist of a General Scope of Work; the Evaluation factors for Phase One to include: Past Performance of the Offeror's team (a minimum the Construction Team and Architect-Engineer); the Technical Qualifications of the team (all key/ major/ critical subcontractors) and Technical Approach. Offeror's will not be required to provide cost or pricing information unless selected for the Phase Two competition.


CBP may select up to a maximum of four of the most highly qualified Phase One firms to submit Phase Two competitive proposals, which shall contain both technical and price proposals to be evaluated separately in accordance with FAR Part 15. A one-time organized Phase Two pre-proposal site visit will be announced at a later date for those selected for the Phase Two competition. Successful Phase One Offerer contact information will not be made available to the public until after Phase Two evaluation and contract award.


The Phase One solicitation package will be available on or about April 16,

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors