East ST louis cut off wall
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912P9-19-R-0024
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- The East St. Louis Flood Control Project or Metro East Sanitary District (Mesd) levees are generally located along the eastern bank of the Mississippi River, between Edwardsville, Illinois and Cahokia, Illinois. The Mesd Stations 973+00 to 1015+00 levee segment along the Mississippi River is the location where the deep cutoff wall is to be constructed. East St Louis, Illinois, United States
Notice details come from SAM.gov. Updated .
Notice text
Description:
This is a Sources Sought Notice. This Sources Sought neither constitutes a Request for Proposal, nor does it restrict the Government to an ultimate acquisition approach. This Sources Sought should not be construed as a commitment by the Government for any purpose. Requests for a solicitation will not receive a response. This Sources Sought Notice is in support of a market survey being conducted by the St. Louis District, Corps of Engineers to identify interested Contractors within the District area for the Scope of Work listed below. The following are general capabilities required to perform the Scope of Work according to USACE standards. The Contractor must be capable to perform the Scope of Work listed below.
General Project Description:
The East St. Louis Flood Control Project or Metro East Sanitary District (MESD) levees are generally located along the eastern bank of the Mississippi River, between Edwardsville, Illinois and Cahokia, Illinois. The MESD Stations 973+00 to 1015+00 levee segment along the Mississippi River is the location where the deep cutoff wall is to be constructed.
Work Statement:
Construction of approximately one continuous section of a deep cutoff wall totaling approximately 4200 linear feet which tie into bedrock, degrade of levee slope and placement of compacted impervious clay fill is needed.
*****MESD Deep Cutoff Wall:
The work provided for herein consists of furnishing all plant, labor, equipment, and material, except earth material from required excavations, and performing all operations necessary for construction of a deep soil-cement-bentonite cutoff wall. MESD deep slurry trench will be panel constructed as a continuous soil-cement-bentonite cutoff wall approximately 120-140 feet deep and tying 2 feet into bedrock, approximately 4200 feet long and a minimum of two feet wide. The slurry wall will be tied into limestone bedrock approximately 120 to 140 feet below existing ground. Construction of the cutoff wall will require a temporary work platform approximately 5 - 10 feet thick. Other construction activities will include removal of unsuitable materials from the riverside face of the existing levee and placement of a minimum 5 foot thick clay cap on the riverside levee face. The subsurface conditions typically consist of 1 to 10 feet of clay material underlain by approximately 110 to 130 feet of sands, gravels, and cobbles. Below the sands is bedrock which the cutoff wall will tie into. Borings in the area indicate occasional rough drilling and the presence of occasional buried rubble (glass, wood, metal). The borings do not indicate continuous layers of rough drilling or rubble at the depths of the proposed cutoff wall. There are a variety of utility crossings along the alignment that might affect construction sequencing.
The soil-cement-bentonite cutoff wall will be required to meet strict QA/QC requirements. For example, the soil-cement-bentonite must meet a minimum permeability requirement of 1x10-6cm/s, clay cap material must meet USCS classification for CL or CH material, in place clay cap material will need to meet 95 percent of the maximum dry density and plus 4 and minus 0 percent of the optimum water content of a standard proctor test. The cutoff wall will also require detailed as-builts. Lab testing and/or in-situ testing will likely be required to verify compliance with permeability requirements.
******* Capability Statements:
1. Explain your capability to panel construct a continuous soil-cement-bentonite cutoff wall to depths of 120 to 140 feet, and maintain the slurry within 2 feet of the ground surface.
2. Briefly explain working in varied soil conditions to include but not limited to sand, gravels, zones of cobbles, and zones of boulders.
3. Explain your capability to verify permeability requirements through permeability testing of wet grab samples obtained from various depths.
SOURCE SOUGHT:
NAICS CODE: 237990 Other Heavy and Civil Engineering Construction
SIZE STANDARD: $36.5 Million
CONTRACT ESTIMATED RANGE: $10,000,000 to $25,000,000
ANTICIPATED SOLICITATION RELEASE DATE: Any solicitation for the nature of work described in this sources sought is subject to the availability of funds. Should funding become available the Government will use responses to this notice as Market Research to develop an acquisition strategy. Any solicitation(s) for this type of work will be made public as required by the Federal Acquisition Regulation at the Government Point of Entry (www.fbo.gov).
POINT OF CONTACT: Responses are to be sent via email to Kristina J Baker at kristina.j.baker@usace.army.mil no later than 3:00 p.m. Central Time, 28 December 2018.
SUBMISSION DETAILS: All interested, responsive and responsible SAM Database registered businesses are encouraged to participate in this sources sought by emailing the required information below to the point of contact listed above. If you are not SAM registered, please do so at www.sam.gov.
Interested businesses shall include the following information to be considered for this Sources Sought announcement:
1. Company name, address, point of contact, phone number/email address and CAGE Code
2. Company's interest if a solicitation for this project is issued
3. Company's business category and size
4. Company's capability to perform on the project description outlined above
.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Electrical Upgrade Weldon Springs | Award Notice | |
| East ST louis cut off wall | Special Notice | |
| East ST louis cut off wall | Solicitation | |
| Electrical Upgrade Weldon Springs | Special Notice | |
| Pre solicitation conference | Special Notice | |
| This notice | Pre-Solicitation |