Dry Dock MV Creve Coeur and Inspect
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912EK24Q0033
- Agency
-
ENDIST Rock Island
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- Place of performance
- Ottawa, Illinois 61350, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Rock Island District, Illinois Waterway Project requires the dry docking and inspection of the Motor Vessel (MV) Creve Coeur, with an option to repair it to ensure proper operation per applicable laws, regulations, and industry standards. The contractor will be responsible for providing the dry dock facility, power to the MV, preparing the MV for dry dock, personnel and vessel safety, completing required inspections including a USCG COI creditable inspection, and submitting proposals for corrective actions. All work must be completed within 4 months after receipt of the order, between July 1 and November 1, 2024.
This opportunity is set aside for small businesses. The solicitation is forthcoming, and the pre-solicitation notice is intended to notify the public of the upcoming solicitation. No incumbent contractor is named, and the potential award value or budget range is not provided. The vessel is a 77-foot inland river towboat with two main engines, two main generators, two gears, two hydraulic steering sections, two bilge areas, two shaft alleys, and other specified systems.
Notice text
THIS IS NOT A REQUEST FOR QUOTE. THIS IS A PRE-SOLICITATION NOTICE. THE INTENT IS TO NOTIFY THE PUBLIC THAT A SOLICITATION IS FORTH COMING IN THE NEAR FUTURE.
SCOPE OF WORK (SOW):
PURPOSE: The US Army Corps of Engineers (USACE), Rock Island District (RID), Illinois Waterway Project (ILWW) requires the dry dock and inspection of Motor Vessel (MV) Creve Coeur with option to repair to ensure the MV is operating as intended, per applicable laws, regulations, and industry standards prior to being placed back in operation.
SPECIFICATIONS:
TIMELINE -
All inspections and authorized repairs shall be completed within 4-months after receipt of order (ARO); KTR timeline: 01 July to 01 November 2024.
OTHER INFORMATION -
USACE will deliver and pickup from the KTR’s dry dock facility, but requests the cost of picking up and dropping off
Shall have the knowledge, skill, and ability to inspect and make repairs to all MV systems and components.
The contractor shall provide dry dock facility, power to MV while at the facility, prepare the MV for dry dock in coordination with USACE, vessel and personnel safety while at KTR’s facility, all personnel, equipment, tools, subcontractors, vessel access during dry dock status and while at KTR facility, Inspection reports, proposals for current and future corrective actions, hot work certification, disposal of all materials unless USACE would like to keep in possession, coordination with USACE and the USCG.
INSPECTIONS -
Contractor (KTR) shall provide, through coordination with the USCG MSU Chicago, a USCG COI creditable documented inspection during the vessels dry dock status per 46 CFR sub chapter M. The MV shall be prepped by the dry dock facility for the USACE COI credibility inspection. The KTR shall supply a proposal which includes supplies and part lead times and the timeline to correct USCG and USACE reported deficiencies that require correction prior to placing back in operation.
Port and Starboard shafts, shaft seals, wheels, rudders, flakers, steering alarms. steering system
Hull thickness inspection report
Rudders
Forward Center Ballast
Port transducer
Telescopic wheelhouse operational systems
All hatch systems
Sewage System
Port and Starboard gensets oil pan gaskets, coolant valve, bearings, bushings, windings, etc.
Starboard main rear seal
High fuel alarm has issues in aft tank.
Fuel and lube oil pumps
Starboard pushing knee
Items not listed and discovered during dry dock inspection or during authorized repair. Repairs are only authorized through a USACE Contracting Officer.
VESSEL DESCRIPTION:
77’ Inland River Towboat
Hull: 476
Year of Manufacture: 1998
- (2) each main engine
- (2) each main generator
- (2) each gear (transmission)
- (2) each hydraulic steering sections
- (2) each bilge area
- (2) each shaft alley
- (1) each waste oil - high level monitoring.
- (1) Each Pilothouse Note: Pilothouse lowers by 10’ to clear bridges and then raises by 10’ during normal operations.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Dry Dock MV Creve Coeur and Inspect | Award Notice | |
| Dry Dock MV Creve Coeur and Inspect | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Drydock repairs for the CGC anvil | — | Total Small Business | |
| Drydock repairs for the CGC patoka | — | No set-aside | |
| Dry-dock: USCGC JOHN MCCORMICK DD FY27 | — | No set-aside | |
| Drydock: USCGC cobia dry dock availability FY2026 | Coast Guard | No set-aside | |
| USACE Debris Collection Vessel RACCOON Dry Dock Services | ENDIST San Francisco | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity