Development of low tech process based restoration design guidance and support for the nationial marine fisheries service in seattle, WA

Closed Solicitation Posted

Solicitation number
NFFP71002102783NGB
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541620 Environmental Consulting Services
PSC
F020 Natural Resources/Conservation- Fisheries Resources Management
Place of performance
Seattle, Washington 98112, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

---AMENDMENT 1: RFQ response date extended to 8/11/2021 by 4PM MDT---

***PLEASE SEE ATTACHED COMBINED SYNOPSIS AND SOW FOR COMPLETE DETAILS***

***AN SF18 WILL NOT BE PROVIDED, PLEASE SUBMIT QUOTE ON YOUR OWN QUOTE FORM***

We seek a technical, repeatable, transparent workflow for facilitating the Low-Tech Process-Based Restoration (LTPBR) design and planning process (http://lowtechpbr.restoration.usu.edu). A standard of practice for LTPBR was established by Wheaton et al. (2019). As a result, 1000s of practitioners have been introduced to the basic theory and rationale.  University courses and professional practice certificates are taught using this framework, and numerous state, federal and local action agencies are now implementing this standard of practice. Moreover, federal, state and local regulatory agencies are increasingly recognizing this standard of practice as an effective management proscription in programmatic consultations and protected species recovery strategies. However, as the standard of practices matures, tools that more efficiently facilitate its implementation are needed to both tackle projects at larger scales and consistently track outcomes across diverse settings. Therefore, a standard workflow to support and document projects from design through implementation is required.

Update #1 ·

***PLEASE SEE ATTACHED COMBINED SYNOPSIS AND SOW FOR COMPLETE DETAILS***

***AN SF18 WILL NOT BE PROVIDED, PLEASE SUBMIT QUOTE ON YOUR OWN QUOTE FORM***

We seek a technical, repeatable, transparent workflow for facilitating the Low-Tech Process-Based Restoration (LTPBR) design and planning process (http://lowtechpbr.restoration.usu.edu). A standard of practice for LTPBR was established by Wheaton et al. (2019). As a result, 1000s of practitioners have been introduced to the basic theory and rationale.  University courses and professional practice certificates are taught using this framework, and numerous state, federal and local action agencies are now implementing this standard of practice. Moreover, federal, state and local regulatory agencies are increasingly recognizing this standard of practice as an effective management proscription in programmatic consultations and protected species recovery strategies. However, as the standard of practices matures, tools that more efficiently facilitate its implementation are needed to both tackle projects at larger scales and consistently track outcomes across diverse settings. Therefore, a standard workflow to support and document projects from design through implementation is required.

Files

File Type Posted
NFFP71002102783 Combined Synopsis - Sample FAC 2021-06.docx DOCX document
NFFP71002102783 SOW RFQ.docx DOCX document
NFFP71002102783 Combined Synopsis - Sample FAC 2021-06.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors