Denison Bridge Crane Rehabilitation at Denison Powerhouse, TX

Award Notice Posted

Solicitation number
W912BV12R0033
Agency
Awarded
to Builders Steel Co., Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912BV-12-C-0022 Federal contract award
NAICS code
333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This requirement will consist of rehabilitation of the 225 ton bridge crane at the Denison Dam Powerhouse located at Denison Texas. Specific requirements include removal of all electrical equipment and wiring on the bridge crane, and the design, fabrication, factory testing, and installation of a new operator's cab and all electrical equipment and associated systems. The equipment includes main-line conductors and collectors, motors, brakes, complete control systems with cab and radio control, conduit, wiring, and auxiliary devices to replace the crane's electrical power, control, and lighting systems. Also required will be the cleaning and visual inspection of existing mechanical equipment installation of new machinery bases, motors, brakes, couplings, gears, gear reducers, wire rope, limit switches, couplings, drums and rail realignment. The crane will also be repainted after all repairs are made.

Update #1 ·

The purpose of this notice is to provide details of this upcoming requirement to prospective offerors prior to advertisement of the package. It is anticipated that the package will be posted here on FBO Est 31 July 2012.

This requirement will consist of rehabilitation of the 225 ton bridge crane at the Denison Dam Powerhouse located at Denison Texas. Specific requirements include removal of all electrical equipment and wiring on the bridge crane, and the design, fabrication, factory testing, and installation of a new operator's cab and all electrical equipment and associated systems. The equipment includes main-line conductors and collectors, motors, brakes, complete control systems with cab and radio control, conduit, wiring, and auxiliary devices to replace the crane's electrical power, control, and lighting systems. Also required will be the cleaning and visual inspection of existing mechanical equipment installation of new machinery bases, motors, brakes, couplings, gears, gear reducers, wire rope, limit switches, couplings, drums and rail realignment. The crane will also be repainted after all repairs are made.

Award will be made using FAR 15 .101-2 Lowest Price Technically Acceptable (LPTA) Source Selection Process.