Denali C Camp Utility Rehabilitation Phase 6 West
Awarded Award Notice Posted
- Solicitation number
- P17PS00085
- Agency
- National Park Service Department of the Interior
- Awarded
- to Prosser-Dagg Construction Company LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- INP17PC00312 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Denali National Park and PreserveMilepost 237 Parks HighwayDenali ParkAK99755USA 99755 USA
- More information
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Nov 04, 2016 4:05 pm
Modified: Nov 09, 2016 7:36 pmTrack Changes
The National Park Service has a requirement for the following project. If you are interested, please submit your detailed capabilities in WRITING to demonstrate same or similar experience. This is not a request for proposal or invitation to bid. There is no bid package, solicitation, specification or drawings available with this announcement. Response is strictly voluntary and no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests.
Your email capability information MUST be 6 pages or less (including bonding letter) and be SPECIFIC to the scope provided. Provide customer point of contact information including email and telephone (i.e. contracting officers, project managers). Provide description of past projects (preferably same or similar past projects), contract numbers, dollar amounts, time frame, duration, location and any other pertinent information. You must also provide a letter from your bonding company verifying your bonding levels per contract and total. Clearly identify your socioeconomic status: (8(a), HUBZone, Service Disabled Veteran, WOSB, EDWOSB, Small).
All firms need to be actively registered in SAM. Your response is due no later than 10:00 a.m. Alaska Time, November 15, 2016.
Please note there is no additional information to be provided at this time. Send your email responses to: darcy_skinner@nps.gov.
Analysis of the quantity and quality of responses to this sources sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
PROJECT TITLE: C Camp Utility Rehabilitation - Phase 6 West
DESCRIPTION: The proposed work consists of water, sewer, and electrical utility replacement for a portion of the employee seasonal residence cabins located at C Camp in the frontcountry area of Denali National Park and Preserve. Seventeen two-occupant cabins are supported by these utilities and provisions are made for one future six-room dorm.
The project consists of:
1. The demolition and installation of 360 feet of 1.5 inch HDPE water main and all water service laterals to 12 existing cabins and the 1 future dormitory.
2. The demolition and installation of 400 feet of 6 inch HDPE sewer main and all 4 inch service laterals to 17 cabins and the 1 future dormitory.
3. The demolition and installation of a new septic tank and absorption field.
4. The demolition and installation of 440 feet of medium voltage distribution including dual-voltage transformers and 830 feet of secondary feeders.
The project will require consideration for employees residing in the cabins from May through September. The project site is located on the road system and the NPS routinely receives OTR shipments daily during the summer.
NAICS Code: 237110
Dollar Magnitude: $500,000 to $1,000,000
Period of Performance is May 1, 2017 to September 15, 2017
Project skills and/or experience that firms are to address in their statement of interest:
1. Work in National Parks, or similar public use areas, during high visitation periods.
2. Work in a congested residential area ensuring safe passage and site conditions for residents.
3. Protection of natural environment during construction.
4. Management of multi-discipline projects.
5. Completion of projects involving rigorous documentation, testing, and quality control requirements, such as: Daily Quality Control Reports, providing accurate & timely documentation for testing results (i.e. soil compaction, hydrostatic pressure, disinfection, Megger, etc), and projects with comprehensive submittal requirements, As-Built Drawings, etc.
Update #1 ·
Added: Nov 04, 2016 4:05 pm Denali C Camp Utility Rehabilitation - Phase 6 West
Notice history
| Notice | Type | Posted |
|---|---|---|
| Denali C Camp Utility Rehabilitation Phase 6 | Award Notice | |
| Denali C Camp Utility Rehabilitation Phase 6 | Award Notice | |
| Denali C Camp Utility Rehabilitation Phase 6 West | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity