Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)
Closed Solicitation Posted
- Solicitation number
- W9127826RA046
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Biloxi, Mississippi, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers, Mobile Engineering District, seeks construction of Phase 1 Breakwater for Deer Island ecosystem restoration in Harrison County, Mississippi, with proposals due July 9. The procurement is a Total Small Business set-aside.
The work involves restoring the rock breakwater structure known as Katrina Key, approximately 12,000 feet in length, through placement of armor layer stone or bioengineered reef and associated geocomposite to return Katrina Key to near historical 1850s dimensions and mitigate normal wave erosion effects. Place of performance is Biloxi, Mississippi. NAICS code 237990 applies (Other Heavy and Civil Engineering Construction); PSC code is Y1PZ (Construction of Other Non-Building Facilities).
The solicitation invokes the Revolutionary FAR Overhaul and carries cybersecurity requirements. Contractor and subcontractor information systems that process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) must comply with CMMC Level 1 (Self) or higher, per DFARS 252.204-7021. Three amendments have been posted: AM0001 on May 28, AM0002 on June 26, and AM0003 on June 30.
Notice text
4 versions
Update #4 · Latest ·
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions.
Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly.
5/28/2026: AM0001 posted to PIEE
6/26/2026: AM0002 posted to PIEE
6/30/2026: AM0003 posted to PIEE
Update #3 ·
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions.
Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly.
5/28/2026: AM0001 posted to PIEE
6/26/2026: AM0002 posted to PIEE
Update #2 ·
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions.
Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly.
Furthermore, this solicitation includes specific cybersecurity requirements. The scope of work requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI). Consequently, the contractor and/or subcontractor(s) must comply with Cybersecurity Maturity Model Certification (CMMC) requirements. The Contractor shall have and maintain for the duration of this contract, order, or agreement a current CMMC status at the following CMMC level, or higher: CMMC Level 1 (Self) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI. For complete details, see DFARS 252.204-7021, "Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements," which outlines the definitions, requirements, reporting, and subcontract information for this contract/order/agreement.
NOTE: Phased implementation of CMMC is expected as follows:
-
From 10 Nov 2025 through 9 Nov 2026: CMMC Levels 1 and 2 (Self Assessments) may be required in solicitations.
-
From 10 Nov 2026 through 9 Nov 2027: Levels 1 and 2 (Self and C3PAO) may be required.
-
From 10 Nov 2027 through 9 Nov 2028: Any CMMC Level may be required in solicitations if the Project Manager (PM) / Requiring Activity (RA) has provided a CMMC level for the specific requirement.
Prior to 10 Nov 2028, the PM/RA has sole discretion to determine if CMMC will be applied to a contract requiring the use of information systems for FCI/CUI. However, beginning 10 Nov 2028, the clause will be prescribed for use if PMs/RAs determine that the contractor will be required to use contractor information systems in the performance of the contract, task order, or delivery order to process, store, or transmit FCI or CUI, excluding awards solely for the acquisition of COTS items.
5/28/2026: AM0001 posted to PIEE
Update #1 ·
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions.
Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly.
Furthermore, this solicitation includes specific cybersecurity requirements. The scope of work requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI). Consequently, the contractor and/or subcontractor(s) must comply with Cybersecurity Maturity Model Certification (CMMC) requirements. The Contractor shall have and maintain for the duration of this contract, order, or agreement a current CMMC status at the following CMMC level, or higher: CMMC Level 1 (Self) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI. For complete details, see DFARS 252.204-7021, "Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements," which outlines the definitions, requirements, reporting, and subcontract information for this contract/order/agreement.
NOTE: Phased implementation of CMMC is expected as follows:
-
From 10 Nov 2025 through 9 Nov 2026: CMMC Levels 1 and 2 (Self Assessments) may be required in solicitations.
-
From 10 Nov 2026 through 9 Nov 2027: Levels 1 and 2 (Self and C3PAO) may be required.
-
From 10 Nov 2027 through 9 Nov 2028: Any CMMC Level may be required in solicitations if the Project Manager (PM) / Requiring Activity (RA) has provided a CMMC level for the specific requirement.
Prior to 10 Nov 2028, the PM/RA has sole discretion to determine if CMMC will be applied to a contract requiring the use of information systems for FCI/CUI. However, beginning 10 Nov 2028, the clause will be prescribed for use if PMs/RAs determine that the contractor will be required to use contractor information systems in the performance of the contract, task order, or delivery order to process, store, or transmit FCI or CUI, excluding awards solely for the acquisition of COTS items.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County) | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Build Repair and Renovation of the Gulf Marine Service Facility (GMSF) & Wharf Repairs, in Pascagoula, Mississippi | National Oceanic and Atmospheric Administration | Total Small Business | |
| Mid-Bay James Island Restoration Phase 2 | ENDIST Baltimore | No set-aside | |
| Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity