Deep Hole Boring Mill - with Amendments

Closed Solicitation Posted

Solicitation number
W519TC-24-R-2022
Agency
ACC Rock Island Army Contracting Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
333517 Machine Tool Manufacturing
PSC
3413 Drilling And Tapping Machines
Place of performance
Rock Island, Illinois 61299, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal seeks to procure a deep hole boring mill with gun drill capabilities. Offerors must meet the technical requirements specified in the Rock Island Purchase Description and provide the documentation required by the Contract Data Requirements List. Proposals will be evaluated on a low price technically acceptable basis, considering experience, compliance with the purchase description, equipment identification, and warranty. The response deadline is February 20, 2024.

This requirement has a total small business set aside. The NAICS code is 333512 and PSC code is 3115. Performance will be at Rock Island, Illinois. The purchase description was amended to require a UNI-50-1500 model machine or equivalent capable of rotating and stationary workpiece configurations with speeds up to 3000 RPM and 38 horsepower. The contractor must provide installation and training, and the machine must meet all safety, design, and performance specifications.

Notice text

4 versions

Update #4 · Latest ·

PLEASE REVIEW ALL ATTACHMENTS

2/14/2024: RIPD Change see Amendments and new RIPD.

1/11/2024:

It is our understanding that the drill tubes are tooling and in order to be prepared for possible scenarios, the request would be to have 1 each of drill tubes spanning from .551in – 1.693in. or whatever dimensional range is provided for the unit. It is our assumption that these items can be purchased from the vendor after contract award based on tooling requirements. This is the same for the guide bushings. Rock Island Arsenal JMTC has a tooling department that handles ordering tooling items, however, it is requested that a set be provided with the machine to ensure effective start up procedures.

In regards to the centering cones versus the 8-in diameter chuck, The 8 in chuck is to be reflected. The centering cones were boiler plate material based on previous procurements of this type of equipment. It is unsure if our current cones would be compatible with this machine therefore it can be disregarded. Again, the assumption here is that after contract award, we can order tooling from the awarded vendor to supplement the equipment based on our tooling needs.

___________________________________________________

Additional Information:

Currently workload is Alloy Steel but it would not be uncommon for there to be aluminum, and occasionally brass work. This is not an all encompassing list. If it can be drilled, bored on a deep hole, the potential for it to go on this machine exists.

As for the runoff, part would be expected as part of the requirement. At this time, a part has not been identified, but per the RIPD the contractor would be responsible for a runoff part that showcases the capabilities of the equipment.

Update #3 ·

PLEASE REVIEW ALL ATTACHMENTS

1/11/2024:

It is our understanding that the drill tubes are tooling and in order to be prepared for possible scenarios, the request would be to have 1 each of drill tubes spanning from .551in – 1.693in. or whatever dimensional range is provided for the unit. It is our assumption that these items can be purchased from the vendor after contract award based on tooling requirements. This is the same for the guide bushings. Rock Island Arsenal JMTC has a tooling department that handles ordering tooling items, however, it is requested that a set be provided with the machine to ensure effective start up procedures.

In regards to the centering cones versus the 8-in diameter chuck, The 8 in chuck is to be reflected. The centering cones were boiler plate material based on previous procurements of this type of equipment. It is unsure if our current cones would be compatible with this machine therefore it can be disregarded. Again, the assumption here is that after contract award, we can order tooling from the awarded vendor to supplement the equipment based on our tooling needs.

___________________________________________________

Additional Information:

Currently workload is Alloy Steel but it would not be uncommon for there to be aluminum, and occasionally brass work. This is not an all encompassing list. If it can be drilled, bored on a deep hole, the potential for it to go on this machine exists.

As for the runoff, part would be expected as part of the requirement. At this time, a part has not been identified, but per the RIPD the contractor would be responsible for a runoff part that showcases the capabilities of the equipment.

Update #2 ·

PLEASE REVIEW ALL ATTACHMENTS

Additional Information:

Currently workload is Alloy Steel but it would not be uncommon for there to be aluminum, and occasionally brass work. This is not an all encompassing list. If it can be drilled, bored on a deep hole, the potential for it to go on this machine exists.

As for the runoff, part would be expected as part of the requirement. At this time, a part has not been identified, but per the RIPD the contractor would be responsible for a runoff part that showcases the capabilities of the equipment.

Update #1 ·

PLEASE REVIEW ALL ATTACHMENTS

Attachments

Files attached to this notice, newest first
File Type Posted
W519TC-24-R-2022 Amendment 0002.pdf PDF
Attachment 0001 - RIPD E4000-24-3-14 rev on 2-13-2024.pdf PDF
W519TC-24-R-2022 Amendment 0001.pdf PDF
Attachment 0001 - RIPD E4000-24-3-14 .pdf PDF
Attachment 0002 - CDRL.pdf PDF
W519TC-24-R-2022.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities