Cylinder assembly, a, in repair/modification of

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N0010425QZA11
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Supply Systems Command is seeking a contractor to perform repair and modification of a CYLINDER ASSEMBLY, A through an Advanced Equipment Repair Program (AERP) sole source repair requirement. This solicitation requires vendors to submit a Firm-Fixed Price (FFP) proposal for a full repair effort, which must include comprehensive cost details for repairing potentially damaged or incomplete equipment. Contractors must provide specific information including teardown and evaluation rates, repair turn-around time (RTAT), and throughput constraints. The solicitation mandates a requested RTAT of 300 days and requires precise reporting of repair transactions within five business days of asset receipt. Proposals are due by December 12, 2024, and must include detailed information about repair capabilities, potential packaging locations, and authorization documentation if the offeror is not the Original Equipment Manufacturer (OEM).

The contract opportunity does not have a specific set-aside designation and is open to qualified manufacturers in the Mechanical Power Transmission Equipment Manufacturing sector. While specific award values are not explicitly stated, the contract will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Contractors must comply with specific technical requirements, including refurbishment according to CAGE 15515, drawing D-6600 Rev 9, and SUBMEPP Repair Instruction 5560-012-0821. The repair process must adhere to strict quality assurance provisions, with parts replacements conforming to the Technical Data Package and repair instructions. Failure to meet the specified RTAT will result in price reductions, and all certification documentation must be submitted via Wide Area Work Flow (WAWF). The contract includes provisions for national defense priority and allows for use of Emergency Acquisition Flexibilities as appropriate.

Notice text

2 versions

Update #2 · Latest ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE & RECEIVING REPORT||TBD|N00104|TBD|TBD|See Schedule|TBD|||TBD||||See form DD1423||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|

EQUAL OPPORTUNITY (SEP 2016)|2|||

WARRANTY OF DATA--BASIC (MAR 2014)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333613|750||||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

The purpose of this amendment is to update the ship to location.

All other terms and conditions remain the same.

\

1. This is an Advanced Equipment Repair Program (AERP) sole source repair requirement.

2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Please include the cost of new or estimated cost of new with the submitted proposal.

3. In repair price, include all costs associated with receipt and complete repair of the material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information:

1. Teardown & Evaluation Rate:

2. Repair Turn Around Time (RTAT):

3. Throughput Constraint:

4. Induction Expiration Date:

4. Repair Turn Around Time (RTAT) the resultant contractual delivery requiremeent is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition

asset at the contractors facility as reflected in the AAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular

business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract.

1. Requested RTAT: 300 Days

2. Proposals shall reference the proposed RTAT and any capacity constraints.

5. Price Reductions Any asset for which the contractor does not meet the requiired RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions

made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Governments right to terminate for default.

6. If requirement will be packaged at a location different from the Offerors adddress, the Offeror shall provide the Company Name, Street Address and CAGE of the Packaging Facility.

7. If the Offeror is not the Original End Manufacturer(OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide a signed letter of authorization to perform repairs from the OEM on

the companys letterhead.

8. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be issued by the Government when copies are either deposited in the mail,l, transmitted by

facsimile, or sent by other electronic commerce method such as email. The Governments acceptance of the contractors proposal constitutes bililateral agreement to issue contractual documents as detailed herein.

9. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.

10. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS).Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy

Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.

11. The IWST determined that all NIINs for this requirement are covered by the 30 July 2018 Class Determination and Findings (D&F) for the Use of Special Emergency Procurement Authority (SEPA) now Emergency Acquisition Flexibiliities (EAF), and that the criteria

in Paragraph 3 thereof and FAR 18.202 are met. Proceed with the use of EAF as appropriate.

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the CYLINDER ASSEMBLY,A .

2. APPLICABLE DOCUMENTS

2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,

however, must supersede applicable laws and regulations unless a specific exemption has been obtained.

2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.

3. REQUIREMENTS

3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;15515; , drawing ;D-6600 Rev 9; ,and the applicable SUBMEPP Repair Instruction ;5560-012-0821 REV B Chg. 1 (CSD582); , except as amplified

or modified herein.

3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.

3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD582 & CSD583; in ECDS at https://register.nslc.navy.mil/

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.

5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

Update #1 ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE & RECEIVING REPORT||TBD|N00104|TBD|TBD|See Schedule|TBD|||TBD||||See form DD1423||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|

EQUAL OPPORTUNITY (SEP 2016)|2|||

WARRANTY OF DATA--BASIC (MAR 2014)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333613|750||||||||||||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|

1. This is an Advanced Equipment Repair Program (AERP) sole source repair requirement.

2. Please provide a Firm-Fixed Price (FFP) proposal for the full repair effort of the requirement. Please include the cost of new or estimated cost of new with the submitted proposal.

3. In repair price, include all costs associated with receipt and complete repair of the material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information:

1. Teardown & Evaluation Rate:

2. Repair Turn Around Time (RTAT):

3. Throughput Constraint:

4. Induction Expiration Date:

4. Repair Turn Around Time (RTAT) the resultant contractual delivery requiremeent is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition

asset at the contractors facility as reflected in the AAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular

business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract.

1. Requested RTAT: 300 Days

2. Proposals shall reference the proposed RTAT and any capacity constraints.

5. Price Reductions Any asset for which the contractor does not meet the requiired RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions

made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Governments right to terminate for default.

6. If requirement will be packaged at a location different from the Offerors adddress, the Offeror shall provide the Company Name, Street Address and CAGE of the Packaging Facility.

7. If the Offeror is not the Original End Manufacturer(OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide a signed letter of authorization to perform repairs from the OEM on

the companys letterhead.

8. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be issued by the Government when copies are either deposited in the mail,l, transmitted by

facsimile, or sent by other electronic commerce method such as email. The Governments acceptance of the contractors proposal constitutes bililateral agreement to issue contractual documents as detailed herein.

9. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.

10. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS).Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy

Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.

11. The IWST determined that all NIINs for this requirement are covered by the 30 July 2018 Class Determination and Findings (D&F) for the Use of Special Emergency Procurement Authority (SEPA) now Emergency Acquisition Flexibiliities (EAF), and that the criteria

in Paragraph 3 thereof and FAR 18.202 are met. Proceed with the use of EAF as appropriate.

\

1. SCOPE

1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the CYLINDER ASSEMBLY,A .

2. APPLICABLE DOCUMENTS

2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,

however, must supersede applicable laws and regulations unless a specific exemption has been obtained.

2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.

3. REQUIREMENTS

3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;15515; , drawing ;D-6600 Rev 9; ,and the applicable SUBMEPP Repair Instruction ;5560-012-0821 REV B Chg. 1 (CSD582); , except as amplified

or modified herein.

3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.

3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD582 & CSD583; in ECDS at https://register.nslc.navy.mil/

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING

5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.

5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.

MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

See CSD (contract support document) called out within paragraph 3 - Requirements.

All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.

Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.

Notice history

Notice Type Posted
Cylinder assembly, a, in repair/modification of Award Award Notice
This notice Latest solicitation Solicitation
Cylinder assembly, a, in repair/modification of Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cylinder assembly, a, in repair/modification of NAICS 336413 Naval Supply Systems Command No set-aside
Cylinder assembly, a NAICS 333613 Naval Supply Systems Command No set-aside
Cylinder assembly, a NAICS 333613 Naval Supply Systems Command No set-aside
Cylinder assembly, a NAICS 333613 Naval Supply Systems Command No set-aside
Cylinder, pneumatic NAICS 336413 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors