CY10 A10Y109 (C4I080) USFK Operations Center (Building Phase/US) &
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W912UM16R0009
- Agency
-
ENDIST Far East
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- U.S. Army Corps of Engineers, Far East District Unit #15546 Apo Ap 96205 Project Site: Usag-Humphreys, South Korea KOR
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The purpose of this contract is to furnish and provide all labor and materials necessary to construct the described below projects:
(1) CY10 A10Y109 (C4I080) USFK Operations Center (Building Phase/US) Project:
This project is primarily interior construction of a 170,000 Square Foot secure work area within the larger two-story, below grade heavily reinforced USFK Operations Center. This facility contains administrative offices, operation centers, data centers, electrical switchgears, uninterruptable power systems, Chemical, Biological, Radiation filtration systems all with redundant capability. Construction shall comply with Intelligence Community Directive (ICD) 705 Standards for Overseas construction. Building envelope is heavily reinforced concrete and includes freight and passenger elevators, multiple blast doors and compartmentalization. Facility, shall comply with DoD Antiterrorism/Force Protection Requirements and other threat mitigation measures.
(2) YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea Project:
This project is primarily for the interior construction of an 82,698 square foot, two-story, secure facility containing administrative offices, a data center, and a utility plant. Construction shall comply with Intelligence Community Directive 705 (ICD 705) series documents and existing DoD standards for overseas construction. Building envelope, which includes blast doors and windows comply with DoD Antiterrorism/Force Protection requirements. Building also includes a two-stop, passenger/freight elevator. Project will also require installation of a crash rated perimeter fence, active barriers, Intrusion Detection Systems (IDS), Access Control Systems (ACS), and CCTV electronic security systems.
ACQUISITION METHOD:
This acquisition is being carried out using a "two-step" procurement process.
• Step 1, Pre-Qualification of Offerors - This announcement of solicitation of pre-qualification submissions is Step 1. The Government will evaluate and rate the pre-qualification submissions based on the procedure and evaluation criteria set forth in section 00 22 16.
• Step 2, Requests for Proposals from Pre-Qualified Offerors - Those pre-qualified offerors will be invited to submit their price proposal to the formal solicitation in Step 2.
Update #1 ·
The purpose of this contract is to furnish and provide all labor and materials necessary to construct the described below projects:
(1) CY10 A10Y109 (C4I080) USFK Operations Center (Building Phase/US) Project:
This project is primarily interior construction of a 170,000 Square Foot secure work area within the larger two-story, below grade heavily reinforced USFK Operations Center. This facility contains administrative offices, operation centers, data centers, electrical switchgears, uninterruptable power systems, Chemical, Biological, Radiation filtration systems all with redundant capability. Construction shall comply with Intelligence Community Directive (ICD) 705 Standards for Overseas construction. Building envelope is heavily reinforced concrete and includes freight and passenger elevators, multiple blast doors and compartmentalization. Facility, shall comply with DoD Antiterrorism/Force Protection Requirements and other threat mitigation measures.
(2) YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea Project:
This project is primarily for the interior construction of an 82,698 square foot, two-story, secure facility containing administrative offices, a data center, and a utility plant. Construction shall comply with Intelligence Community Directive 705 (ICD 705) series documents and existing DoD standards for overseas construction. Building envelope, which includes blast doors and windows comply with DoD Antiterrorism/Force Protection requirements. Building also includes a two-stop, passenger/freight elevator. Project will also require installation of a crash rated perimeter fence, active barriers, Intrusion Detection Systems (IDS), Access Control Systems (ACS), and CCTV electronic security systems.
ACQUISITION METHOD:
This acquisition is being carried out using a "two-step" procurement process.
• Step 1, Pre-Qualification of Offerors - This announcement of solicitation of pre-qualification submissions is Step 1. The Government will evaluate and rate the pre-qualification submissions based on the procedure and evaluation criteria set forth in section 00 22 16.
• Step 2, Requests for Proposals from Pre-Qualified Offerors - Those pre-qualified offerors will be invited to submit their price proposal to the formal solicitation in Step 2.
Files
| File | Type | Posted |
|---|---|---|
| W912UM-16-R-0009.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| CY10 A10Y109 (C4I080) USFK Operations Center (Building Phase/US) & | Award Notice | |
| This notice | Solicitation | |
| CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US) & YRP PN A08Y101 (C4I030-1), Phase III Facility, USAG Humphreys, Korea | Award Notice | |
| CY10 A10Y109 (C4I080) KORCOM Operations Center (Building Phase/US) & | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity