Cooling towers water treatment services
Award Notice Posted
- Solicitation number
- W911RQ16T0001
- Agency
-
ACC Warren
Army Contracting Command, Department of Defense
- Awarded
- to Green And Sustainable Services, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911RQ-16-P-0033 Federal contract award
- NAICS code
- 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- ACC- Warren (ACC-WRN)(Rrad) Attn: Ccta-HDR, 100 Main Drive, Building 431 Texarkana TX 75507 US
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: GREEN AND SUSTAINABLE SVS, LLC. Contract Award Dollar Amount: $56,362.80. Contract Award Date: 2016-02-11.
Update #4 ·
The contractor shall provide all labor, chemicals, equipment, transportation, and supplies required to provide the services described herein: to treat the cooling towers water located in Bldg. 373 and Bldg. 324 US ARMY DEPOT, RED RIVER, TEXARKANA, TEXAS, every month.
The contractor shall provide a written report to the COR of his findings. The written report shall document the condition of the makeup water and cooling towers water, and the settings for the various chemical pumps, and any other features or characteristics that the contractor decides is necessary and useful.
The contractor shall provide the chemicals required to treat the cooling water towers. The chemicals shall be equal in effectiveness to:
1. Garratt Callahan Formula 305, a biocide containing sodium hypochlorite and sodium chloride;
2. Garratt Callahan Formula 3004, a biocide containing tetrakis (hydroxymethyl) phosphonium sulfate;
3. Garratt Callahan Formula 2610, a treatment chemical containing potassium hydroxide, l-aspartic acid,
homopolymer, PBTC, HEDP, sodium metaborate, and sodium tolytriazole.
The contractor shall be responsible for ensuring that the required chemicals are delivered to the depot when needed and that they are stored in a safe, secure location on depot during use.
Period of performance for this requirement is four years: one base and three option years..
Update #3 ·
The contractor shall provide all labor, chemicals, equipment, transportation, and supplies required to provide the services described herein: to treat the cooling towers water located in Bldg. 373 and Bldg. 324 US ARMY DEPOT, RED RIVER, TEXARKANA, TEXAS, every month.
The contractor shall provide a written report to the COR of his findings. The written report shall document the condition of the makeup water and cooling towers water, and the settings for the various chemical pumps, and any other features or characteristics that the contractor decides is necessary and useful.
The contractor shall provide the chemicals required to treat the cooling water towers. The chemicals shall be equal in effectiveness to:
1. Garratt Callahan Formula 305, a biocide containing sodium hypochlorite and sodium chloride;
2. Garratt Callahan Formula 3004, a biocide containing tetrakis (hydroxymethyl) phosphonium sulfate;
3. Garratt Callahan Formula 2610, a treatment chemical containing potassium hydroxide, l-aspartic acid,
homopolymer, PBTC, HEDP, sodium metaborate, and sodium tolytriazole.
The contractor shall be responsible for ensuring that the required chemicals are delivered to the depot when needed and that they are stored in a safe, secure location on depot during use.
Period of performance for this requirement is four years: one base and three option years.
Update #2 ·
The contractor shall provide all labor, chemicals, equipment, transportation, and supplies required to provide the services described herein: to treat the cooling towers water located in Bldg. 373 and Bldg. 324 US ARMY DEPOT, RED RIVER, TEXARKANA, TEXAS, every month.
The contractor shall provide a written report to the COR of his findings. The written report shall document the condition of the makeup water and cooling towers water, and the settings for the various chemical pumps, and any other features or characteristics that the contractor decides is necessary and useful.
The contractor shall provide the chemicals required to treat the cooling water towers. The chemicals shall be equal in effectiveness to:
1. Garratt Callahan Formula 305, a biocide containing sodium hypochlorite and sodium chloride;
2. Garratt Callahan Formula 3004, a biocide containing tetrakis (hydroxymethyl) phosphonium sulfate;
3. Garratt Callahan Formula 2610, a treatment chemical containing potassium hydroxide, l-aspartic acid,
homopolymer, PBTC, HEDP, sodium metaborate, and sodium tolytriazole.
The contractor shall be responsible for ensuring that the required chemicals are delivered to the depot when needed and that they are stored in a safe, secure location on depot during use.
Period of performance for this requirement is four years: one base and three option years..
Update #1 ·
The contractor shall provide all labor, chemicals, equipment, transportation, and supplies required to provide the services described herein: to treat the cooling towers water located in Bldg. 373 and Bldg. 324 US ARMY DEPOT, RED RIVER, TEXARKANA, TEXAS, every month.
The contractor shall provide a written report to the COR of his findings. The written report shall document the condition of the makeup water and cooling towers water, and the settings for the various chemical pumps, and any other features or characteristics that the contractor decides is necessary and useful.
The contractor shall provide the chemicals required to treat the cooling water towers. The chemicals shall be equal in effectiveness to:
1. Garratt Callahan Formula 305, a biocide containing sodium hypochlorite and sodium chloride;
2. Garratt Callahan Formula 3004, a biocide containing tetrakis (hydroxymethyl) phosphonium sulfate;
3. Garratt Callahan Formula 2610, a treatment chemical containing potassium hydroxide, l-aspartic acid,
homopolymer, PBTC, HEDP, sodium metaborate, and sodium tolytriazole.
The contractor shall be responsible for ensuring that the required chemicals are delivered to the depot when needed and that they are stored in a safe, secure location on depot during use.
Period of performance for this requirement is four years: one base and three option years.
Files
| File | Type | Posted |
|---|---|---|
| W911RQ-16-T-0001.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity