Construct Multi-Use Trail
Closed Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- W519TC-24-R-2060
- Agency
- ACC Rock Island Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Rock Island, Illinois 61299, United States
- Points of contact
-
- Julie Culliton julie.k.culliton.civ@army.mil
- Kathy Ward kathleen.m.ward20.civ@army.mil (309) 782-0998
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Contracting Command Rock Island Arsenal (ACC Rock Island) is issuing a pre-solicitation notice for a contract to construct a multi-use trail. The scope of work includes furnishing labor, equipment, and material to grade and place a 10-foot wide shared use path consisting of 4 inches of hot mix asphalt on 6 inches of modified subbase. The contractor will be required to commence work within 14 days after receiving the notice to proceed and complete the work in 60 working days.
This contract opportunity is set aside for small businesses. The rough order of magnitude for the project is between $250,000 and $500,000, and performance and payment bonds are required. The location of the project is between East Street and the Deer Crossing housing development on the north side of Rodman Avenue on the Rock Island Arsenal in Rock Island, Illinois.
Notice text
This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents to include the full Scope of Work. It is anticipated the solicitation will be released on or about July 8, 2024.
IAW FAR 36.204(d), the rough order of magnitude of this project is between $250,000.00 and $500,000.00.
Performance and Payment Bonds are required.
The scope of this project consists of furnishing labor, equipment, and material to grade and place a 10' wide shared use path consisting of 4" of hot mix asphalt on 6" modified subbase. The location of the project is between East Street and the Deer Crossing housing development on the north side of Rodman Avenue on the Rock Island Arsenal, Rock Island IL.
The Contractor will be required to commence work under this contract within 14 days after the date the Contractor receives the Notice to Proceed, prosecute the work diligently, and complet the Scope of Work in 60 working days.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construct Multi-Use Trail | Solicitation | |
| Construct Multi-Use Trail | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity