Concrete Batch Plant Site Development at Montgomery Locks and Dam in Beaver County, PA

Closed Solicitation Posted

Solicitation number
W911WN23B8001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238910 Site Preparation Contractors

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Corps of Engineers Engineering District Pittsburgh seeks a contractor to perform concrete batch plant site development at Montgomery Locks and Dam in Beaver County, Pennsylvania. The work includes furnishing and installing erosion controls, stormwater management, site clearing and grading, retaining walls, access roads, electrical work including transformer pads and conduit, and placement of brush reef bundles. Proposals are due by January 27, 2023, and will be evaluated for technical qualifications, past performance, and price.

There is no set-aside designation. The primary NAICS code is 237990 and PSC code is R499. Mascaro Construction Company, LP provided the lowest bid of $15,956,818.00 at the opening. The government estimate was $26,880,768.00. The work involves excavation, soil installation, final grading, fencing, retaining walls, concrete work, utility work, and transportation of materials on the site in Beaver County, Pennsylvania, to be completed by the awarded contractor.

Notice text

4 versions

Update #4 · Latest ·

The Concrete Batch Plant Site Development consists of the following work tasks and activities: a. Furnish and Install all related erosion and sedimentation controls(E-SC), stormwater management controls, stormwater drainage facilities, including site perimeter bypass flow channel(s), sediment basin / stormwater pond, all related perimeter and in-pad piping, inlets, and outflow aprons and pipe connections, and temporary fencing. b. Perform all related tree cutting, clearing and grubbing, demolition, excavation, providing and installing additional soil (if needed) to rough-grade the site and proper, legal removal and disposal of unacceptable material from the site. c. Provide a compacted aggregate (gravel) final graded surface and perform final grading of the site to the elevations required. d. Remove all related security and protective fencing from above esplanade sloped area, store material that is reusable and provide new (perimeter) fencing of the type and form where shown on contract drawings. e. Provide retaining wall structures along two alignments, to support the developed site, consisting of:(1) One approximately 920 foot long, 12+/- foot high, post and panel retaining wall and transitions to grade along the south side of the site. (2) One approximately 785 foot long, 14+/- foot tall post and panel retaining wall and associated soil anchors, associated access stairways and ramps, and transitions to grade, along the north side of the site (within an existing area of sloped concrete pavers), and removal and replacement of concrete lined ditch and base of wall. f. Provide reinforced concrete transformer pads and accessory items (including all noted conduit penetrations, conduit, grounding, elbows, secondary duct bank, electrical vault) on the site, where designated. Included with the electrical work is continuous SECTION 01 11 00 Page 2100% CERTIFIED FINAL - W911WN23B8001 Montgomery Locks and Dam Concrete Batch Plant Site Development coordination with local power company and maintaining existing electrical service to esplanade during all construction operations for the duration of the period of performance of the contract. g. Construct approximately 215 feet of a 24-foot wide access driveway to the site from an existing adjacent paved roadway (Montgomery Dam Road). h. Rehabilitate approximately 175 feet of existing access roadway (Montgomery Dam Road) leading to the esplanade, including road widening, milling, leveling, paving, removal of old and installation of new guide rail, traffic control. i. Perform all work related to meet other regulatory / permit requirements. j. Construct, transport, place and anchor 29 large and small brush reef bundles using approved tree and brush material from site Clearing and Grubbing Operations. (1) Transport large and small brush reef bundles from the site location to the Montgomery Slough located across the Ohio River from the Montgomery lock and just upstream of the Montgomery Dam. (2) Method of transportation used to Montgomery Slough shall be approved by the Contracting Officer or designated representative.

On 27 January 2023, the Bid Opening was held virtually at 11:00am EST. Bid Opening Results and Attendance Sheet are attached.

Update #3 ·

The Concrete Batch Plant Site Development consists of the following work tasks and activities: a. Furnish and Install all related erosion and sedimentation controls(E-SC), stormwater management controls, stormwater drainage facilities, including site perimeter bypass flow channel(s), sediment basin / stormwater pond, all related perimeter and in-pad piping, inlets, and outflow aprons and pipe connections, and temporary fencing. b. Perform all related tree cutting, clearing and grubbing, demolition, excavation, providing and installing additional soil (if needed) to rough-grade the site and proper, legal removal and disposal of unacceptable material from the site. c. Provide a compacted aggregate (gravel) final graded surface and perform final grading of the site to the elevations required. d. Remove all related security and protective fencing from above esplanade sloped area, store material that is reusable and provide new (perimeter) fencing of the type and form where shown on contract drawings. e. Provide retaining wall structures along two alignments, to support the developed site, consisting of:(1) One approximately 920 foot long, 12+/- foot high, post and panel retaining wall and transitions to grade along the south side of the site. (2) One approximately 785 foot long, 14+/- foot tall post and panel retaining wall and associated soil anchors, associated access stairways and ramps, and transitions to grade, along the north side of the site (within an existing area of sloped concrete pavers), and removal and replacement of concrete lined ditch and base of wall. f. Provide reinforced concrete transformer pads and accessory items (including all noted conduit penetrations, conduit, grounding, elbows, secondary duct bank, electrical vault) on the site, where designated. Included with the electrical work is continuous SECTION 01 11 00 Page 2100% CERTIFIED FINAL - W911WN23B8001 Montgomery Locks and Dam Concrete Batch Plant Site Development coordination with local power company and maintaining existing electrical service to esplanade during all construction operations for the duration of the period of performance of the contract. g. Construct approximately 215 feet of a 24-foot wide access driveway to the site from an existing adjacent paved roadway (Montgomery Dam Road). h. Rehabilitate approximately 175 feet of existing access roadway (Montgomery Dam Road) leading to the esplanade, including road widening, milling, leveling, paving, removal of old and installation of new guide rail, traffic control. i. Perform all work related to meet other regulatory / permit requirements. j. Construct, transport, place and anchor 29 large and small brush reef bundles using approved tree and brush material from site Clearing and Grubbing Operations. (1) Transport large and small brush reef bundles from the site location to the Montgomery Slough located across the Ohio River from the Montgomery lock and just upstream of the Montgomery Dam. (2) Method of transportation used to Montgomery Slough shall be approved by the Contracting Officer or designated representative.

Update #2 ·

The Concrete Batch Plant Site Development consists of the following work tasks and activities: a. Furnish and Install all related erosion and sedimentation controls(E-SC), stormwater management controls, stormwater drainage facilities, including site perimeter bypass flow channel(s), sediment basin / stormwater pond, all related perimeter and in-pad piping, inlets, and outflow aprons and pipe connections, and temporary fencing. b. Perform all related tree cutting, clearing and grubbing, demolition, excavation, providing and installing additional soil (if needed) to rough-grade the site and proper, legal removal and disposal of unacceptable material from the site. c. Provide a compacted aggregate (gravel) final graded surface and perform final grading of the site to the elevations required. d. Remove all related security and protective fencing from above esplanade sloped area, store material that is reusable and provide new (perimeter) fencing of the type and form where shown on contract drawings. e. Provide retaining wall structures along two alignments, to support the developed site, consisting of:(1) One approximately 920 foot long, 12+/- foot high, post and panel retaining wall and transitions to grade along the south side of the site. (2) One approximately 785 foot long, 14+/- foot tall post and panel retaining wall and associated soil anchors, associated access stairways and ramps, and transitions to grade, along the north side of the site (within an existing area of sloped concrete pavers), and removal and replacement of concrete lined ditch and base of wall. f. Provide reinforced concrete transformer pads and accessory items (including all noted conduit penetrations, conduit, grounding, elbows, secondary duct bank, electrical vault) on the site, where designated. Included with the electrical work is continuous SECTION 01 11 00 Page 2100% CERTIFIED FINAL - W911WN23B8001 Montgomery Locks and Dam Concrete Batch Plant Site Development coordination with local power company and maintaining existing electrical service to esplanade during all construction operations for the duration of the period of performance of the contract. g. Construct approximately 215 feet of a 24-foot wide access driveway to the site from an existing adjacent paved roadway (Montgomery Dam Road). h. Rehabilitate approximately 175 feet of existing access roadway (Montgomery Dam Road) leading to the esplanade, including road widening, milling, leveling, paving, removal of old and installation of new guide rail, traffic control. i. Perform all work related to meet other regulatory / permit requirements. j. Construct, transport, place and anchor 29 large and small brush reef bundles using approved tree and brush material from site Clearing and Grubbing Operations. (1) Transport large and small brush reef bundles from the site location to the Montgomery Slough located across the Ohio River from the Montgomery lock and just upstream of the Montgomery Dam. (2) Method of transportation used to Montgomery Slough shall be approved by the Contracting Officer or designated representative. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8001' to obtain more details.*

Update #1 ·

The Concrete Batch Plant Site Development consists of the following work tasks and activities: a. Furnish and Install all related erosion and sedimentation controls(E-SC), stormwater management controls, stormwater drainage facilities, including site perimeter bypass flow channel(s), sediment basin / stormwater pond, all related perimeter and in-pad piping, inlets, and outflow aprons and pipe connections, and temporary fencing. b. Perform all related tree cutting, clearing and grubbing, demolition, excavation, providing and installing additional soil (if needed) to rough-grade the site and proper, legal removal and disposal of unacceptable material from the site. c. Provide a compacted aggregate (gravel) final graded surface and perform final grading of the site to the elevations required. d. Remove all related security and protective fencing from above esplanade sloped area, store material that is reusable and provide new (perimeter) fencing of the type and form where shown on contract drawings. e. Provide retaining wall structures along two alignments, to support the developed site, consisting of:(1) One approximately 920 foot long, 12+/- foot high, post and panel retaining wall and transitions to grade along the south side of the site. (2) One approximately 785 foot long, 14+/- foot tall post and panel retaining wall and associated soil anchors, associated access stairways and ramps, and transitions to grade, along the north side of the site (within an existing area of sloped concrete pavers), and removal and replacement of concrete lined ditch and base of wall. f. Provide reinforced concrete transformer pads and accessory items (including all noted conduit penetrations, conduit, grounding, elbows, secondary duct bank, electrical vault) on the site, where designated. Included with the electrical work is continuous SECTION 01 11 00 Page 2100% CERTIFIED FINAL - W911WN23B8001 Montgomery Locks and Dam Concrete Batch Plant Site Development coordination with local power company and maintaining existing electrical service to esplanade during all construction operations for the duration of the period of performance of the contract. g. Construct approximately 215 feet of a 24-foot wide access driveway to the site from an existing adjacent paved roadway (Montgomery Dam Road). h. Rehabilitate approximately 175 feet of existing access roadway (Montgomery Dam Road) leading to the esplanade, including road widening, milling, leveling, paving, removal of old and installation of new guide rail, traffic control. i. Perform all work related to meet other regulatory / permit requirements. j. Construct, transport, place and anchor 29 large and small brush reef bundles using approved tree and brush material from site Clearing and Grubbing Operations. (1) Transport large and small brush reef bundles from the site location to the Montgomery Slough located across the Ohio River from the Montgomery lock and just upstream of the Montgomery Dam. (2) Method of transportation used to Montgomery Slough shall be approved by the Contracting Officer or designated representative.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8001' to obtain more details.* (Solicitation, Plans & Specs Attachments)

Files

File Type Posted
W911WN23B8001 - Bid Opening Attendance.pdf PDF
W911WN23B8001 - Bid Opening Results.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Site Development at Montgomery Locks & Dam, Beaver County, PA Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Pittsburgh facility 079 MEP parking lot erosion control 7100 Leech Farm Rd, Pittsburgh, PA 15206 15206 ENDIST Philadelphia No set-aside