Multi-Directional Fork-Lift - Holloman AFB FA480124318MM
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA480124318MM
- Agency
-
Air Combat Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333924 Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
- Place of performance
- Holloman AFB, New Mexico, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force's Air Combat Command is seeking to procure two multi-directional combilifts for Holloman Air Force Base through a Request for Quote (RFQ) with solicitation number FA480124318MM. The required combilifts must have a maximum lift height of 13'5" and be capable of handling container weights between 4,000 and 15,000 pounds, with the ability to stack containers up to 12' high in confined warehouse spaces. Detailed technical specifications are provided in the attached "RBCP MHE Specifications - Combilift" document, which outlines precise dimensional and performance requirements. The government will evaluate quotes using a Lowest Price Technically Acceptable (LPTA) source selection process, considering both price and technical capability. Quotes are due by December 19, 2024, at 12:00 PM Mountain Standard Time, with an anticipated 52-week lead time for delivery.
The solicitation is designated as a total small business set-aside under NAICS code 333924 (Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing), with the non-manufacturer rule waived for this requirement. The procurement will result in a purchase order for two combilifts to be delivered and performed at Holloman Air Force Base in New Mexico, with a maximum working weight capacity exceeding 15,400 pounds at full lift and extension. While specific award values are not explicitly stated, the technical specifications suggest a sophisticated material handling equipment procurement with units capable of advanced warehouse operations. The solicitation indicates that funds are available for this procurement, and the government intends to award to a responsible offeror meeting the technical specifications and providing the lowest pricing. The equipment must meet detailed requirements including a diesel engine, four-direction operation, and specific safety and operational features.
Notice text
11 versions
Update #11 · Latest ·
49 CONS/PKA at Holloman AFB is looking to purchase two brand new multi-directional fork-lifts that meet or exceed the specifications in the attachment "RBCP MHE Specifications". In accordance with (IAW) FAR 13.106-2(b)(1), the Lowest Price Technically Acceptable (LPTA) selection process shall be applied. Award will be made to the vendor who is deemed responsible, responsive, and represents the best value to thegovernment based on selection of the lowest evaluated price that is deemed technically acceptable. Please see the attached COMBO dated 10 Dec 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time. Used or refurbished multi-directional fork-lifts will not be accepted.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 108 inch Length x 88 inch Width x 91 inch Height
Bicons 10 ft Length x 8 ft Width x 8 ft and 6 inches Height
Tricons 8 ft Length x 6 ft Width x 8ft and 5.5 inches Height
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 10 Dec 24
2. RBCP MHE Specifications
Update #10 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet or exceed the specifications in the attachment "RBCP MHE Specifications". In accordance with (IAW) FAR 13.106-2(b)(1), the Lowest Price Technically Acceptable (LPTA) selection process shall be applied. Award will be made to the vendor who is deemed responsible, responsive, and represents the best value to thegovernment based on selection of the lowest evaluated price that is deemed technically acceptable. Please see the attached COMBO dated 10 Dec 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 108 inch Length x 88 inch Width x 91 inch Height
Bicons 10 ft Length x 8 ft Width x 8 ft and 6 inches Height
Tricons 8 ft Length x 6 ft Width x 8ft and 5.5 inches Height
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 10 Dec 24
2. RBCP MHE Specifications
Update #9 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet or exceed the specifications in the attachment "RBCP MHE Specifications". In accordance with (IAW) FAR 13.106-2(b)(1), the Lowest Price Technically Acceptable (LPTA) selection process shall be applied. Award will be made to the vendor who is deemed responsible, responsive, and represents the best value to thegovernment based on selection of the lowest evaluated price that is deemed technically acceptable. Please see the attached COMBO dated 26 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 108 inch Length x 88 inch Width x 91 inch Height
Bicons 10 ft Length x 8 ft Width x 8 ft and 6inches Height
Tricons 8 ft Length x 6 ft Width x 8ft and 5.5 inches Height
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 26 Nov 24
2. RBCP MHE Specifications
Update #8 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet the specifications in the attachment "RBCP MHE Specifications". Please see the attached COMBO dated 26 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 108 inch Length x 88 inch Width x 91 inch Height
Bicons 10 ft Length x 8 ft Width x 8 ft and 6inches Height
Tricons 8 ft Length x 6 ft Width x 8ft and 5.5 inches Height
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 26 Nov 24
2. RBCP MHE Specifications
Update #7 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet the specifications in the attachment "RBCP MHE Specifications". Please see the attached COMBO dated 26 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 180 in Length x 88 in Width x 91 in Height
Bicons 10 ft Length x 8 ft Width x 8 ft and 6in Height
Tricons 8 ft Length x 6 ft Width x 8ft and 5.5 inches Height
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 26 Nov 24
2. RBCP MHE Specifications
Update #6 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet the specifications in the attachment "RBCP MHE Specifications". Please see the attached COMBO dated 26 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
The contrainer dimensions that the Multi-Directional Fork-Lift will be lifiting is as follows:
ISU 90s 180 in x 88 in x 91 in high
Bicons 10 ft x 8 ft x 8 ft, 6in high
Tricons 8 ft x 6 ft, 5.5 in x 8 ft high
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 26 Nov 24
2. RBCP MHE Specifications
Update #5 ·
49 CONS/PKA at Holloman AFB is looking to purchase two multi-directional fork-lifts that meet the specifications in the attachment "RBCP MHE Specifications". Please see the attached COMBO dated 26 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 26 Nov 24
2. RBCP MHE Specifications
Update #4 ·
49 CONS/PKA at Holloman AFB is looking to purchase two combilifts that is or something similar to the C30000JD - 25000LBS capacity @ 48". The combilifts must meet the specifications in the attachment "RBCP MHE Specifications - Combilift". Please see the attached COMBO dated 13 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
Any questions pertaining to the requirement must be submitted by 26 Nov 24, 1000 MST. Any question submitted after this time and date will no longer be accepted.
Attachments:
1. COMBO 13 Nov 24
2. RBCP MHE Specifications - Comblift
Update #3 ·
49 CONS/PKA at Holloman AFB is looking to purchase two combilifts that is or something similar to the C30000JD - 25000LBS capacity @ 48". The combilifts must meet the specifications in the attachment "RBCP MHE Specifications - Combilift". Please see the attached COMBO dated 13 Nov 24 for further details. This requirement has a lead time of 52 weeks. The goverment has the right to cancel this solicitation at any time.
The nonmanufacture rule is waived for this requirement.
Attachments:
1. COMBO 13 Nov 24
2. RBCP MHE Specifications - Comblift
Update #2 ·
49 CONS/PKA at Holloman AFB is looking to purchase two combilifts that is or something similar to the C30000JD - 25000LBS capacity @ 48". The combilifts must meet the specifications in the attachment "RBCP MHE Specifications - Combilift". Please see the attached COMBO dated 13 Nov 24 for further details. This requirement has a lead time of 52 weeks.
The nonmanufacture rule is waived for this requirement.
Attachments:
1. COMBO 13 Nov 24
2. RBCP MHE Specifications - Comblift
Update #1 ·
49 CONS/PKA at Holloman AFB is looking to purchase two combilifts that meet the specifications in the attachment "RBCP MHE Specifications - Combilift". Please see the attached COMBO dated 13 Nov 24 for further details. This requirement has a lead time of 52 weeks.
The nonmanufacture rule is waived for this requirement.
Attachments:
1. COMBO 13 Nov 24
2. RBCP MHE Specifications - Comblift
Files
| File | Type | Posted |
|---|---|---|
| RBCP MHE Specifications.pdf | ||
| COMBO 10 Dec 24.pdf | ||
| RBCP MHE Specifications.pdf | ||
| RBCP MHE Specifications.pdf | ||
| RBCP MHE Specifications.pdf | ||
| COMBO 26 Nov 24.pdf | ||
| COMBO 19 Nov 24.pdf | ||
| COMBO 19 Nov 24.pdf | ||
| COMBO 19 Nov 24.pdf | ||
| COMBO 13 Nov 24.pdf | ||
| RBCP MHE Specifications - Comblift.pdf |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Forklift Buy | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Hoisting unit, aircraft | Construction and Equipment | Total Small Business | |
| Request for Information - Halvorsen 25k Aircraft Cargo Loader | AFLCMC Robins AFB | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity