Columbia River Channel Improvements (CRCI) Pipe Procurement and Install

Closed Solicitation Posted

Solicitation number
W9127N24B0002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Cathlamet, Washington 98612, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is seeking a firm-fixed price construction contract valued between $1,000,000 to $5,000,000 to procure and install three 30-inch inside diameter steel pipes through the Puget Island levee in Cathlamet, Washington for permanent upland dredge disposal activities. The U.S. Army Corps of Engineers, Portland District will evaluate proposals based on technical qualifications and price to install the pipes with reinforced concrete foundation blocks, backfill with controlled density fill and filter material, install fencing, and complete related incidental work. The deadline for proposals is February 15, 2024.

There is no set-aside designation for this opportunity. The NAICS code is 237990 for specialty trade contractors with a small business size standard of $45,000,000. Procurement of the pipes is estimated to require 10 to 12 weeks, with an estimated construction period of 4 to 6 weeks beginning in May 2024 depending on the award date. Six bids were received in response to the solicitation ranging from $2,000,000 to $3,300,000 with the apparent low bid from Navik Kohsar Construction Company at $2,000,000.

Notice text

5 versions

Update #5 · Latest ·

15-FEB-2024: Bid Abstract has been posted.

07-FEB-2024: The purpose of this Amendment is to add the revised Plan Set (B.08 Amendment 0002 CRCI_ADVERTISE_PLAN_SET_02FEB2024). This amendment clarifies that controlled density fill is not required outside the levee limits (C-301) and that HDPE may not be used for the gravity pipes (C-204). The table of estimated quantities on C-101 has been updated. All other terms and conditions remain unchanged.

30-JAN-2024: The purpose of this Amendment is to revise the Specifications section 40 05 13.00 para 2.3.1.1.(b.).
b. The pressurized pipe must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of 0.95 inch. The gravity outfall pipes must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of .750 inch. Gravity outfall pipes can be the same thickness as the pressure pipe, but this is not required. Pipes are not required to be coated but coating does not need to be removed if products come coated.

The 26-JAN-24 Site Visit sign in sheet is posted w ith this Amendment as w ell as the revised Plan Set (B.08 Amendment 0001
CRCI_ADVERTISE_PLAN_SET29JAN2024). All other terms and conditions remain unchanged.

16-JAN-2024: Plans/Specs Uploaded

This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry
Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.

The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench
excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).

Update #4 ·

07-FEB-2024: The purpose of this Amendment is to add the revised Plan Set (B.08 Amendment 0002 CRCI_ADVERTISE_PLAN_SET_02FEB2024). This amendment clarifies that controlled density fill is not required outside the levee limits (C-301) and that HDPE may not be used for the gravity pipes (C-204). The table of estimated quantities on C-101 has been updated. All other terms and conditions remain unchanged.

30-JAN-2024: The purpose of this Amendment is to revise the Specifications section 40 05 13.00 para 2.3.1.1.(b.).
b. The pressurized pipe must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of 0.95 inch. The gravity outfall pipes must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of .750 inch. Gravity outfall pipes can be the same thickness as the pressure pipe, but this is not required. Pipes are not required to be coated but coating does not need to be removed if products come coated.

The 26-JAN-24 Site Visit sign in sheet is posted w ith this Amendment as w ell as the revised Plan Set (B.08 Amendment 0001
CRCI_ADVERTISE_PLAN_SET29JAN2024). All other terms and conditions remain unchanged.

16-JAN-2024: Plans/Specs Uploaded

This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry
Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.

The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench
excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).

Update #3 ·

30-JAN-2024: The purpose of this Amendment is to revise the Specifications section 40 05 13.00 para 2.3.1.1.(b.).
b. The pressurized pipe must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of 0.95 inch. The gravity outfall pipes must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of .750 inch. Gravity outfall pipes can be the same thickness as the pressure pipe, but this is not required. Pipes are not required to be coated but coating does not need to be removed if products come coated.

The 26-JAN-24 Site Visit sign in sheet is posted w ith this Amendment as w ell as the revised Plan Set (B.08 Amendment 0001
CRCI_ADVERTISE_PLAN_SET29JAN2024). All other terms and conditions remain unchanged.

16-JAN-2024: Plans/Specs Uploaded

This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry
Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.

The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench
excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).

Update #2 ·

16-JAN-2024: Plans/Specs Uploaded

This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry
Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.

The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench
excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).

Update #1 ·

This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry
Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.

The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench
excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Columbia River Channel Improvements Pipe Procurement and Installation Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY26 Willapa Harbor Maintenance Dredging Washington, United States · NAICS 237990 ENDIST Seattle No set-aside
Camp wooten/starbuck levee rehab Starbuck, Washington 99359, United States · NAICS 237990 ENDIST Walla Walla No set-aside
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation NAICS 332812 ENDIST Walla Walla Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors