COLO 253093 York River Shoreline Stabilization 2B

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140P2021R0066
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
P.O. Box 210, Yorktown, VA 23690 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice from the National Park Service seeks information from potential offerors for the York River Shoreline Stabilization Phase 2B project located at Colonial National Historical Park in Yorktown, Virginia. The project involves stabilizing and rehabilitating approximately 3.1 miles of eroded York River shoreline through placement of stone, geotextile fabric, earthwork, slope stabilization techniques, wetland work, and other incidental construction activities over a 540 day period of performance. Offerors should demonstrate by February 15, 2021 their experience on similar size, scope and complexity projects performed under comparable conditions, as well as their business classification, bonding capacity, and marketing materials. The agency intends to issue an RFP in late winter/spring 2021 for this design-build project valued over $10 million.

There is no set-aside designation for this opportunity. The primary NAICS code is 237990 and PSC code is C213. As the incumbent, the National Park Service is currently responsible for similar shoreline stabilization work at this location. The project scope encompasses two reaches totaling approximately 3.1 miles of York River shoreline to be stabilized over 540 calendar days with a budget estimated at over $10 million.

Notice text

COLO 253093 - York River Shoreline Stabilization Phase 2B, Colonial National Historical Park, Yorktown, Virginia. This project will stabilize and rehabilitate portions of the York River shoreline that have been severely eroded. The stability of Colonial Parkway is threatened without repairs to the steep embankments that are within 25-50 feet of the Parkway. The project is design-build and includes pre- and post- construction surveys of the project area, clearing and grubbing, repositioning of existing stone, placement of riprap stone to construct rock sills, breakwaters, and revetment structures, the placement of geotextile fabric, excavation and filling earthwork, steep slope stabilization with geotextile bags and steel sheet pile wall, planting on the geotextile bag slopes, wetland fill material placement, wetland planting, and any incidental work related to the construction of this project. The project encompasses a portion of the York River shoreline between Williamsburg and Yorktown, and includes two reaches of approximately 3.1 miles with a total period of performance of 540 days. Reach 1 extends from Felgates Creek on the west to Indian Field Creek on the east, a distance of about 1.7 miles. Reach 2 extends from the mouth of Indian Field Creek on the west to the west pier of the Yorktown Naval Weapons Station on the east, a distance of about 1.4 miles. The project shall improve shoreline erosion control, stability, and natural wetland habitat for decades to come. This is a sources sought announcement, not a formal solicitation. Please see the attachment for further information regarding how to respond to this sources sought announcement.

Files

File Type Posted
COLO 253093 Sources Sought Notice_1.pdf PDF

Notice history

Notice Type Posted
COLO 253093 - York River Shoreline Stabilization Award Award Notice
COLO 253093 - York River Shoreline Stabilization Latest solicitation Solicitation
COLO 253093 - York River Shoreline Stabilization Phase 2B, Colonial National Hi Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia Fort Eustis, Virginia 23604, United States · NAICS 237990 ENDIST Norfolk No set-aside
Timucuan Ecological and Historic Preserve TIMU-335 NAICS 237990 National Office No set-aside
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors